CN100562172C - The method that a kind of channel resource is reshuffled - Google Patents

The method that a kind of channel resource is reshuffled Download PDF

Info

Publication number
CN100562172C
CN100562172C CNB2006100992110A CN200610099211A CN100562172C CN 100562172 C CN100562172 C CN 100562172C CN B2006100992110 A CNB2006100992110 A CN B2006100992110A CN 200610099211 A CN200610099211 A CN 200610099211A CN 100562172 C CN100562172 C CN 100562172C
Authority
CN
China
Prior art keywords
aoa
current
thresholding
control device
net control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100992110A
Other languages
Chinese (zh)
Other versions
CN101111054A (en
Inventor
曲晓宁
尹桂杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Potevio Information Technology Co Ltd
Original Assignee
Potevio Institute of Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Institute of Technology Co Ltd filed Critical Potevio Institute of Technology Co Ltd
Priority to CNB2006100992110A priority Critical patent/CN100562172C/en
Publication of CN101111054A publication Critical patent/CN101111054A/en
Application granted granted Critical
Publication of CN100562172C publication Critical patent/CN100562172C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses the method that a kind of channel resource is reshuffled, set in advance the AOA report condition of current UE in this method, and comprise: the AOA of the current UE that satisfies report condition that the base station will measure, report net control device, net control device is that current UE is carried out channel resource and reshuffled according to the AOA that receives.Use this method can effectively improve the follow-up control of net control device, and reduce the unnecessary number of times that reports, reduce the operand of net control device UE.

Description

The method that a kind of channel resource is reshuffled
Technical field
The present invention relates to a kind of method of channel resource allocation, relate in particular to the method that a kind of channel resource is reshuffled.
Background technology
Along with developing rapidly of wireless mobile telecommunication technology, smart antenna utilizes mobile subscriber's signal and deletion fully efficiently or suppresses interference signal, thereby be applied to mobile communication system more and more widely owing to can utilize Digital Signal Processing.
Mobile communication system generally comprises subscriber equipment (UE, User Equipment), base station and net control device.In the mobile communication system of existing use smart antenna, the arrival angle of this signal can also be measured in the base station when receiving the upward signal of UE transmission by smart antenna, and promptly ripple reaches angle (AOA, Angle of Arrival).In the channel reconfiguration course, the base station reports net control device with the AOA signal period that records, the AOA of the upward signal that net control device reports according to the base station, can know the positional information of UE, thereby can be the suitable channel resource of terminal distribution, the UE that can think close beam direction distributes the resource of different time-gap, different frequency, thereby can reduce the interference between the user, improves the quality and the success rate for switching of customer call.
Wherein, the net control device in the 3G mobile communication system is radio network controller (RNC, Radio Network Control); Net control device in the 2G mobile communication system is base station controller (BSC, Base Station Control).
Be example now, above-mentioned channel resource reconfiguration course is described in detail with TD SDMA (TD-SCDMA) mobile communication system that adopts 3G standard.As shown in Figure 1, Fig. 1 carries out the flow chart that channel is reshuffled in the prior art, and this flow process comprises the steps:
Step 101 is set up the dedicated wireless channel link.
Step 102, the AOA special measurement control content of the Iub interface between configurating base station and the RNC.
In this step, RNC is by the AOA special measurement control content of configuration Iub interface, and which kind of mode indication adopts AOA is reported to the base station.Except when UE locatees, being provided with the base station reports immediately to AOA, the base station being set generally speaking AOA is carried out periodicity reporting in the existing method.
Step 103, the base station reports RNC information cycle with the AOA that records.
Step 104~105, RNC receives the AOA information that the base station reports, and changes determining whether that needs are that current UE reconfigures channel resource according to the angle of AOA, if desired, judges then whether present available channel resources is enough, enough execution in step 106 then; If available channel resources is not enough or need not then to return execution in step 103 for current UE reconfigures channel resource.
Step 106, RNC is that UE reconfigures new channel resource, returns execution in step 103 afterwards.
As seen, in the prior art, the base station to AOA what report employing is periodically to report, long in this report method if the cycle is provided with, when the UE fast moving, will certainly cause the mobile tracking scarce capacity of RNC to UE, it is inaccurate that channel resource is reshuffled algorithm; If the cycle is provided with too short, then, can cause RNC to handle mass data in a short time because RNC supports the resource management function of a large amount of UE, increase the burden of RNC.
Summary of the invention
In view of this, the invention provides the method that a kind of channel resource is reshuffled, this method can effectively improve the follow-up control to UE, and reduces the unnecessary number of times that reports, and reduces operand.
The method that channel resource provided by the present invention is reshuffled is achieved by following technical solution:
The method that a kind of channel resource is reshuffled, in this method, two of angle of arrival AOA that set in advance current user equipment UE report the triggering thresholding: first thresholding and second thresholding, first thresholding are greater than second thresholding, and this method comprises the steps:
A, the base station AOA by measuring current UE reports net control device with this AOA outside the interval range that two thresholdings constitute the time, and net control device is that current UE is carried out channel resource and reshuffled according to the AOA that receives.
Preferably, set in advance the maximum that continues to surpass the thresholding time, described this AOA is reported before the net control device, also comprise: the time of described AOA outside the interval range that described two thresholdings constitute reaches the maximum that continues to surpass the thresholding time that sets in advance.
Wherein, net control device described in the steps A is that current UE is carried out the channel resource reprovision and is changed to according to the AOA that receives:
Net control device is divided at least one subregion with the microzonation that the base station covers, different frequency and the time interval resources of UE qualification for different subregions, when carrying out resource reconfiguration for current UE, the AOA that reports according to the base station determines the residing subregion of current UE, distributes running time-frequency resource according to subregion of living in for this UE.
Preferably, net control device described in the steps A is that current UE is carried out before channel resource reshuffles according to the AOA that receives, further comprise: net control device judges whether available channel resources is enough, if enough, then carry out channel resource for current UE and reshuffles; If not enough, then return execution in step A.
Wherein, described subregion is represented with the interval that two border angles constitute.Two of the then described AOA that sets in advance current UE report trigger gate to be limited to:
Determine the subregion of current UE sub-district of living in, be provided with two and report and trigger thresholding two border angle values with this partition angles scope are corresponding respectively that wherein, first thresholding is corresponding to big border angle value, second thresholding is corresponding to little border angle value.
In the said method, described net control device is: radio network controller (RNC).
This shows that method provided by the present invention is by being configured AOA special measurement control content, and set in advance AOA and report trigger condition, when reaching trigger condition, just report, report number of times, reduce the amount of calculation of net control device thereby can effectively reduce; And just report when reaching trigger condition, can effectively improve the ability that net control device is followed the tracks of UE, when UE rapid when mobile, net control device perception in time, and this UE carried out resource reconfiguration.
In addition, owing to be provided with the maximum that needs to continue to surpass the thresholding time, thus can effectively reduce false alarm probability, and further reduce the operand of net control device.
At last, because the microzonation that the base station is covered is divided at least one zone, and be different frequency of each area limiting and time interval resource, thereby make net control device after obtaining AOA, can be according to the residing zone of UE, distinguishing allocation of channel resources may improves efficiency of resources distribution, and effectively reduces the interference of minizone.
Description of drawings
Fig. 1 is the exemplary process diagram of the method that channel resource is reshuffled in the prior art.
Fig. 2 is the exemplary process diagram of the method that channel resource is reshuffled in the embodiment of the invention.
Fig. 3 carries out the schematic diagram of subregion for the several sub-districts that in embodiment illustrated in fig. 2 the base station covered.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, the present invention is described in more detail.
Basic thought of the present invention is: report the triggering thresholding by the special measurement control content is provided with two, the base station reports according to the AOA information that the thresholding that is provided with will be in outside the interval range that described thresholding constitutes, thereby can effectively reduce the amount of calculation of net control device, improve follow-up control UE.Further, be divided at least one zone, be each area limiting different frequency and time interval resource, thereby net control device can be this UE allocation of channel resources may according to the residing zone of UE by the microzonation that the base station is covered.
Be example with the TD-SCDMA mobile communication system that adopts 3G standard still below, the method that channel resource among the present invention is reshuffled is described in detail in conjunction with the embodiments.
Embodiment:
Referring to Fig. 2, Fig. 2 is the exemplary process diagram of the method that channel resource is reshuffled in the embodiment of the invention.This flow process comprises the steps:
Step 201 is set up the dedicated wireless channel link.
Step 202, RNC is that the AOA of current UE is provided with two and reports the triggering thresholding: the first thresholding EVENT_A and the second thresholding EVENT_B, and EVENT_A>EVENT_B, indicate to the base station by the special measurement control content of configuration Iub interface then.
In this step, described EVENT_A and EVENT_B act as: if the angle value of the AOA of current UE is greater than the EVENT_A that sets, perhaps the angle value of the AOA of current UE is less than the EVENT_B that sets, be that the AOA angle value of current UE is in outside the interval range that two thresholdings constitute, then trigger the base station AOA of current UE is reported.
Step 203~204, the AOA of base station measurement current UE, and judge whether this AOA information satisfies report condition, and if satisfy, then the base station reports RNC with the AOA information that records, execution in step 205 then; Otherwise return execution in step 203.
In this step, the base station is by measuring the AOA of current UE, and AOA and two thresholding EVENT_A and EVENT_B compared respectively, if the AOA angle value of current UE is in outside the interval range that described thresholding constitutes, then the base station reports RNC with the AOA information that records.
Wherein, report in order to reduce unnecessary the repeating that causes owing to the UE state labile, promptly in order to reduce false alarm probability, can set in advance a maximum of T that continues to surpass the thresholding time, when the AOA angle value that records is in after time outside the interval range that two thresholdings constitute reaches the maximum of T of above-mentioned setting, then the base station reports this AOA information.
Step 205, RNC judges whether present available channel resources is enough after receiving the AOA information that the base station reports, if enough, then execution in step 206; Otherwise return execution in step 203.
Step 206, RNC is that UE reconfigures new channel resource.
In this step, RNC be the UE method that reconfigures new channel resource except can use conventional methods distribute, can also adopt following method to be configured:
At first, RNC divides different radially coverages to the sub-district that each base station covers, and is about to the zone that microzonation is divided into several different angles scopes, and for being in the different frequency and the time interval resources of terminal qualification of different range, i.e. time-frequency resource.As shown in Figure 3, Fig. 3 is to the subregional schematic diagram of microzonation, each subregion is represented with the interval that two border angles constitute, the angular range of supposing subregion 1 is (A1, A2), and be the certain radio channel resource of each zone configuration, promptly limiting corresponding frequency (Freq) and time slot (slot), the preferential use of the UE in each subregion is the resource of this zone configuration.The institutional framework of the partition table that RNC safeguards is as shown in Table 1:
Subregion sign Explanation
CELL ID The sub-district indicates
Number of partitions Be how many subregions of this cell configuration
{ It below is information unit with the number of partitions equal number
A1 Angle border 1
A2 Angle border 2.Subregion is positioned at<A1, A2〉between.
Frquency Count The frequency number that this subregion uses
{
Frquency 1 Frequency 1
Slot Info Operable gap information under this frequency
}
}
Table one
Suppose sub-district 1 is divided into n subregion, the angular range of subregion 1 be (A1, A2), the frequency number is n1, wherein, can use time interval resource 1-1 under the frequency 1-1 ..., can use time interval resource 1-n1 under the frequency 1-n1; The angular range of subregion 2 be (A2, A3), the frequency number is n2, wherein, can use time interval resource 2-1 under the frequency 2-1 ..., can use time interval resource 2-n2 under the frequency 2-n2; The rest may be inferred, the angular range of subregion n be (An, An+1), the frequency number is nn, wherein, can use time interval resource n-1 under the frequency n-1 ..., can use time interval resource n-nn under the frequency n-nn.In like manner, the area dividing of other sub-district and taxonomic structure and above-mentioned situation are similar.Detailed textural classification can be with reference to table two:
Figure C20061009921100091
Table two
Wherein, the content in the list item is calculated according to situations such as interfering with each other of the service conditions of UE and actual environment in the network planning and when optimizing and is got.
Then, RNC can obtain the subregion scope under this UE according to the AOA of the current UE of receiving when current UE is reconfigured resource, carry out resource allocation targetedly for this UE afterwards, avoids the co-channel interference of minizone.
In addition, by safeguarding the partition table of this sub-district, can also for being provided with the AOA that need allocate, this UE report triggering thresholding EVENT_A and EVENT_B according to the regional extent of the residing subregion of each UE in step 202.As be in UE in the subregion 1 of sub-district 1, and when it is determined to trigger thresholding EVENT_A and EVENT_B, two thresholdings can be corresponded respectively to this regional border angle A2 and A1, suppose that A2 is greater than A1.When the UE moving range is crossed over two partitioned areas, trigger channel resource and reshuffle.
So far, the flow performing of present embodiment finishes.
The foregoing description is that example has been carried out a kind of displaying to thought of the present invention with the TD-SCDMA mobile communication system of 3G standard just, is not to be used for limiting protection scope of the present invention.Be appreciated that the thought among the present invention can be used for other communication system equally.Therefore, within the spirit and principles in the present invention all, any modification of being made, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (7)

1, a kind of channel resource method of reshuffling is characterized in that, two of angle of arrival AOA that set in advance current user equipment UE report the triggering thresholding: first thresholding and second thresholding, first thresholding are greater than second thresholding, and this method comprises the steps:
A, the base station AOA by measuring current UE reports net control device with this AOA outside the interval range that two thresholdings constitute the time, and net control device is that current UE is carried out channel resource and reshuffled according to the AOA that receives.
2, the method for claim 1, it is characterized in that, set in advance the maximum that continues to surpass the thresholding time, described this AOA is reported before the net control device, also comprise: the time of described AOA outside the interval range that described two thresholdings constitute reaches the maximum that continues to surpass the thresholding time that sets in advance.
3, the method for claim 1 is characterized in that, net control device described in the steps A is that current UE is carried out the channel resource reprovision and is changed to according to the AOA that receives:
Net control device is divided at least one subregion with the microzonation that the base station covers, different frequency and the time interval resources of UE qualification for different subregions, when carrying out resource reconfiguration for current UE, the AOA that reports according to the base station determines the residing subregion of current UE, distributes running time-frequency resource according to subregion of living in for this UE.
4, method as claimed in claim 3, it is characterized in that, net control device described in the steps A is that current UE is carried out before channel resource reshuffles according to the AOA that receives, further comprise: net control device judges whether available channel resources is enough, if enough, then carry out channel resource and reshuffle for current UE; If not enough, then return execution in step A.
5, method as claimed in claim 3 is characterized in that, described subregion is represented with the interval that two border angles constitute.
6, method as claimed in claim 5 is characterized in that, two of the described AOA that sets in advance current UE report trigger gate to be limited to:
Determine the subregion of current UE sub-district of living in, be provided with two and report and trigger thresholding two border angle values with this partition angles scope are corresponding respectively that wherein, first thresholding is corresponding to big border angle value, second thresholding is corresponding to little border angle value.
7, method as claimed in claim 3 is characterized in that, described net control device is: radio network controller (RNC).
CNB2006100992110A 2006-07-21 2006-07-21 The method that a kind of channel resource is reshuffled Expired - Fee Related CN100562172C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100992110A CN100562172C (en) 2006-07-21 2006-07-21 The method that a kind of channel resource is reshuffled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100992110A CN100562172C (en) 2006-07-21 2006-07-21 The method that a kind of channel resource is reshuffled

Publications (2)

Publication Number Publication Date
CN101111054A CN101111054A (en) 2008-01-23
CN100562172C true CN100562172C (en) 2009-11-18

Family

ID=39042906

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100992110A Expired - Fee Related CN100562172C (en) 2006-07-21 2006-07-21 The method that a kind of channel resource is reshuffled

Country Status (1)

Country Link
CN (1) CN100562172C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102006618A (en) * 2009-09-03 2011-04-06 普天信息技术研究院有限公司 Method for reporting common measurement event
CN105813108B (en) 2010-03-29 2019-11-01 Lg电子株式会社 Method and apparatus for the measurement to the Inter-Cell Interference Coordination in radio communications system
CN102256259A (en) * 2010-05-19 2011-11-23 鼎桥通信技术有限公司 Method and device for distributing HSPA (High Speed Packet Access) access dynamic channel based on single cell
CN106888470B (en) * 2015-12-16 2020-02-18 润建股份有限公司 Method and device for performing channel measurement by wireless network
CN111614375B (en) * 2020-04-17 2022-06-17 深圳市联诚发科技股份有限公司 Data transmission method, data transmission device, terminal and storage medium

Also Published As

Publication number Publication date
CN101111054A (en) 2008-01-23

Similar Documents

Publication Publication Date Title
CN109788488B (en) Network station planning method and device
US9826420B2 (en) Self-optimizing wireless network
KR101090602B1 (en) Method and Apparatus for managing paging area
CN100407837C (en) Mobile terminal measuring control method in multiple carrier frequency small region and multiple small region
CN104640145B (en) A kind of method and system for solving running time-frequency resource conflict
CN111356147B (en) Method and device for positioning faults of indoor partition cells
CN101208977A (en) Evaluation of random access lead code
CN100562172C (en) The method that a kind of channel resource is reshuffled
CN102905287B (en) Communication terminal and method of measurement thereof and measurement mechanism
CN102088726A (en) Frequency multiplexing method and device
WO2018184667A1 (en) Apparatus and method for performing network optimization
CN109392040A (en) The method of user equipment and its progress cell reselection, computer-readable medium
CN110521231A (en) Wireless deployment in zoning
CN104796277A (en) Network fault monitoring method and device
CN102082584B (en) Interference detection method and interference detection device in time division synchronous code multiple address access system
CN103002495A (en) Assessment method and device of wireless network structure
CN114786268A (en) Data transmission bandwidth adjusting method and device, electronic equipment and storage medium
CN101998453A (en) Method for transmitting and receiving channel quality measurement indication signaling
CN104918331A (en) Frequency resource allocation method and device
CN102457912B (en) Method and device for sending load instruction information
CN104038962A (en) Device, base station and method for controlling UE (user equipment) to report neighborhood information
CN102104895A (en) Dynamic simulation method and device aiming at coexistence of system interference
CN103686895A (en) Switching control method, wireless network controller and access node
CN101784060A (en) Parameter processing method, network diagnosis method, terminal, server and system
CN103974321B (en) The monitoring method and device of a kind of repeater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: PUTIAN IT TECH INST CO., LTD.

Free format text: FORMER NAME: PUTIAN INST. OF INFORMATION TECHNOLOGY

CP03 Change of name, title or address

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Address before: 100085, No. two, 2 street, base of information industry, Beijing

Patentee before: POTEVIO Institute of Information Technology

ASS Succession or assignment of patent right

Owner name: PUTIAN IT TECH INST CO., LTD.

Free format text: FORMER OWNER: CHINA POTEVIO CO., LTD.

Effective date: 20130509

Owner name: CHINA POTEVIO CO., LTD.

Free format text: FORMER OWNER: PUTIAN IT TECH INST CO., LTD.

Effective date: 20130509

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130509

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Address before: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee before: CHINA POTEVIO CO.,LTD.

Effective date of registration: 20130509

Address after: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee after: CHINA POTEVIO CO.,LTD.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method and device for reconfiguring channel resources

Effective date of registration: 20131210

Granted publication date: 20091118

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee

Owner name: POTEVIO INFORMATION TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: PUTIAN IT TECH INST CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20151102

Granted publication date: 20091118

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20151102

Registration number: 2013990000954

Pledgor after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Pledgor before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method and device for reconfiguring channel resources

Effective date of registration: 20151105

Granted publication date: 20091118

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20161008

Granted publication date: 20091118

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method and device for reconfiguring channel resources

Effective date of registration: 20161011

Granted publication date: 20091118

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170802

Granted publication date: 20091118

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091118