Embodiment
Below with one of them preferred embodiment the present invention program is described in detail.
As shown in Figure 2, be the schematic flow sheet of the flat section survey method for drafting of RTK-GPS of the present invention embodiment.As shown in Figure 2, it comprises step:
Step S101: field operation RTK-GPS associating total powerstation gathers terrain data, and when image data, according to default coding standard the data that gather are encoded, be specially, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard, enter step S102;
Step S102: interior industry is according to above-mentioned default coding standard, resolve above-mentioned coded file data, coded file data after obtaining resolving, be specially, interior industry is resolved above-mentioned RTK-GPS coded file data according to above-mentioned default RTK-GPS coding standard, and the RTK-GPS coded file data after obtaining resolving are resolved above-mentioned total powerstation coded file data according to above-mentioned default total powerstation coding standard, total powerstation coded file data after obtaining resolving enter step S103;
Step S103: according to the coded file data after above-mentioned default coding standard, the above-mentioned parsing, calculating is with the measuring point coordinate of coding, be specially, according to the total powerstation coded file data after the RTK-GPS coded file data after above-mentioned default RTK-GPS coding standard, the above-mentioned parsing, above-mentioned default total powerstation coding standard, the above-mentioned parsing, calculating enters step S104 with the measuring point coordinate of coding;
Step S104: carry out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generate CASS software interface file.
Scheme according to the invention described above, it is by formulating default RTK-GPS coding standard, default total powerstation coding standard, the field operation data acquisition modes is standardized, based on the observation data with coding, during enforcement, field operation does not need skeletonizing, when interior industry is processed, the observation data with the atural object coding according to field data acquisition, according to identical default RTK-GPS coding standard, default total powerstation coding standard is resolved the atural object measuring point automatically, can be according to default total powerstation, RTK-GPS, CASS atural object codes match standard is carried out Auto-matching and is generated CASS software interface file, and the automatic topographic mapping of application CASS software, do not need artificial participation, realized the efficient processing to data, finally realized unified atural object coding standard, standardization ground carries out the field data collection, realize automatically, efficiently, seamless software data is processed, and forms the integrated measurement scheme of RTK-GPS associating total powerstation.
In addition, high, the not intensive area in the house, be unfavorable for Setting Station of Total Station Instrument, efficient was very low when the application total powerstation was measured, work efficiency can be improved more than 50% and use the RTK-GPS mapping, and the invention described above scheme has realized that the associating of RTK-GPS and total powerstation is integrated, has greatly improved the efficient of topomap mapping.
When application RTK-GPS, total powerstation carried out the field data collection, the specific implementation of field data observation can be to adopt existing mode in the prior art, does not repeat them here.
Default coding standard of the present invention, it is the integrated coding standard of total powerstation and RTK-GPS, during formulation, the difference of the characteristics of measuring for total powerstation, RTK-GPS, formulate respectively corresponding coding standard, that is, and according to the collection characteristics of RTK-GPS field data, formulate RTK-GPS coding standard (being above-mentioned default RTK-GPS coding standard), the atural object coding that comprises when for example the RTK-GPS field operation is measured, atural object figure number, atural object period, direction attribute information etc.; Collection characteristics according to the total powerstation field data, formulate total powerstation coding standard (being above-mentioned default total powerstation coding standard), the job information that comprises when measuring such as the total powerstation field operation, known stake data, default prism height, prism side-play amount, survey station establish that station beginning, stake position observation, rear apparent direction, detail point begin, atural object is observed the information such as begin, according to this RTK-GPS coding standard and total powerstation coding standard, not only can record the measuring point information of atural object, and the attributes such as direction, the number of plies, material of record atural object.Field operation is when using certain mode image data, the coding standard corresponding according to this mode, directly the data that gather are inputted according to this coding standard, perhaps equipment behind the input information of correspondence is encoded according to this coding standard voluntarily, concrete implementation does not repeat them here.
Because the RTK-GPS metering system is different from the total station survey mode, therefore, for its different measuring characteristic, above-mentioned with formulated two the cover coding standards encode respectively to describe, in order to realize the automatic drafting of topomap, need to mate these two kinds of coding standards, so that these two kinds of coding standards can collaborative work.In the present invention program, by the mode of the corresponding same CASS atural object coding of these two kinds of coding standards is mated.
The concrete mode that adopts can be, formulate total powerstation, RTK-GPS, CASS atural object codes match standard (is above-mentioned default total powerstation, RTK-GPS, CASS atural object codes match standard), during concrete coupling, by resolving the CASS coding standard, realize the coupling of RTK-GPS coding standard and CASS coding standard, and the coupling of total powerstation coding standard and CASS coding standard, namely by the RTK-GPS coding standard is mated with the mode of the corresponding same CASS coding standard of total powerstation coding standard, during specific implementation, customizable CASS guiding coding is to form total powerstation, the external encode that RTK-GPS is unified.
Calculating the measuring point coordinate time with coding in above-mentioned steps S103, is to calculate in conjunction with coding, and concrete account form can be to adopt existing mode in the prior art, does not repeat them here.
According to the invention described above coding RTK-GPS total powerstation integrated landform measuring method arranged, the present invention also provides a kind of integrated landform measuring system of coding RTK-GPS total powerstation that has, as shown in Figure 3, be the structural representation that the integrated landform measuring system of coding RTK-GPS total powerstation embodiment is arranged of the present invention, it includes:
Data importing unit 202 is used for importing the coded file data, and the coded file data here comprise RTK-GPS coded file data, total powerstation coded file data;
The resolution unit 203 that is connected with data importing unit 202, be used for resolving above-mentioned RTK-GPS coded file data according to default RTK-GPS coding standard, RTK-GPS coded file data after obtaining resolving, resolve above-mentioned total powerstation coded file data according to default total powerstation coding standard, the total powerstation coded file data after obtaining resolving;
The measuring point computing unit 204 that is connected with resolution unit 203, be used for according to the total powerstation coded file data after the RTK-GPS coded file data after above-mentioned default RTK-GPS coding standard, the above-mentioned parsing, above-mentioned default total powerstation coding standard, the above-mentioned parsing, calculate the measuring point coordinate with coding;
The interface document generation unit 205 that is connected with measuring point computing unit 204 is used for carrying out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generates CASS software interface file.
In addition, of the present invention have the integrated landform measuring system of coding RTK-GPS total powerstation to include:
Field operation unit 201, be used for when field operation RTK-GPS associating total powerstation gathers terrain data, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard.
Scheme according to the invention described above, it is by formulating default RTK-GPS coding standard, default total powerstation coding standard, the field operation data acquisition modes is standardized, based on the observation data with coding, during enforcement, field operation does not need skeletonizing, when interior industry is processed, the observation data with the atural object coding according to field data acquisition, according to identical default RTK-GPS coding standard, default total powerstation coding standard is resolved the atural object measuring point automatically, can be according to default total powerstation, RTK-GPS, CASS atural object codes match standard is carried out Auto-matching and is generated CASS software interface file, and the automatic topographic mapping of application CASS software, do not need artificial participation, realized the efficient processing to data, finally realized unified atural object coding standard, standardization ground carries out the field data collection, realize automatically, efficiently, seamless software data is processed, and forms the integrated measurement scheme of RTK-GPS associating total powerstation.
In addition, high, the not intensive area in the house, be unfavorable for Setting Station of Total Station Instrument, efficient was very low when the application total powerstation was measured, work efficiency can be improved more than 50% and use the RTK-GPS mapping, and the invention described above scheme has realized that the associating of RTK-GPS and total powerstation is integrated, has greatly improved the efficient of topomap mapping.
When application RTK-GPS, total powerstation carried out the field data collection, the specific implementation of field data observation can be to adopt existing mode in the prior art, does not repeat them here.
Default coding standard of the present invention, it is the integrated coding standard of total powerstation and RTK-GPS, during formulation, the difference of the characteristics of measuring for total powerstation, RTK-GPS, formulate respectively corresponding coding standard, that is, and according to the collection characteristics of RTK-GPS field data, formulate RTK-GPS coding standard (being above-mentioned default RTK-GPS coding standard), the atural object coding that comprises when for example the RTK-GPS field operation is measured, atural object figure number, atural object period, direction attribute information etc.; Collection characteristics according to the total powerstation field data, formulate total powerstation coding standard (being above-mentioned default total powerstation coding standard), the job information that comprises when measuring such as the total powerstation field operation, known stake data, default prism height, prism side-play amount, survey station establish that station beginning, a stake observation, rear apparent direction, detail point begin, atural object is observed the information such as begin.According to this RTK-GPS coding standard and total powerstation coding standard, not only can record the measuring point information of atural object, and the attributes such as direction, the number of plies, material of record atural object.Field operation is when using certain mode image data, the coding standard corresponding according to this mode, directly the data that gather are inputted according to this coding standard, perhaps equipment behind the input information of correspondence is encoded according to this coding standard voluntarily, concrete implementation does not repeat them here.
Because the RTK-GPS metering system is different from the total station survey mode, therefore, for its different measuring characteristic, above-mentioned with formulated two the cover coding standards encode respectively to describe, in order to realize the automatic drafting of topomap, need to mate these two kinds of coding standards, so that these two kinds of coding standards can collaborative work.In the present invention program, by the mode of the corresponding same CASS atural object coding of these two kinds of coding standards is mated.
The concrete mode that adopts can be, formulate total powerstation, RTK-GPS, CASS atural object codes match standard (is above-mentioned default total powerstation, RTK-GPS, CASS atural object codes match standard), during concrete coupling, by resolving the CASS coding standard, realize the coupling of RTK-GPS coding standard and CASS coding standard, and the coupling of total powerstation coding standard and CASS coding standard, namely by the RTK-GPS coding standard is mated with the mode of the corresponding same CASS coding standard of total powerstation coding standard, during specific implementation, customizable CASS guiding coding is to form total powerstation, the external encode that RTK-GPS is unified.
At the measuring point coordinate time that above-mentioned steps measuring point computing unit 204 calculates with coding, be to calculate in conjunction with coding, concrete account form can be to adopt existing mode in the prior art, does not repeat them here.
In addition, considering interior industry when the coded file data are processed, should be that standard, complete encoded data files are processed, and therefore, system of the present invention can also comprise:
Inspection unit 2012 is used for described coded file data are checked, and judges whether wrong information of these coded file data according to check result, if wrong information, export this error message, if error-free information then imports described coded file data by described data importing unit 202
Inspection unit 2012 is when checking the coded file data, the concrete scope of examination can be: inspection of stake etc. before and after the inspection of data integrity, the column foot landform, except these, can also check other guide, according to different needs, the different scopes of examination can be set, not repeat them here.
According to the invention described above the coding integrated landform measuring method of RTK-GPS total powerstation and system arranged, below just be elaborated with one of them concrete example of each default coding standard.
At first, for RTK-GPS topographical surveying atural object coding standard, its encoded content is followed successively by: atural object coding-atural object figure number-atural object period-direction attribute.Below just list the coding of several atural objects according to this atural object coding standard:
⑴ reference mark:
1. planimetric control point:
The TGD-figure number mapping base point of layinging of markstone
2. other reference mark:
BM-figure number leveling point
GPS-figure number GPS reference mark
⑵ water system facility:
1. natural river:
HE-figure number-period water front (permanent stream waterside line)
2. artificical stream:
GOUZ-figure number-period-direction irrigation canals and ditches ditch
GGOU-figure number-period-direction two-wire hondo the right
⑶ settlement place:
1. general house:
The general house of FANG-figure number-period-number of plies
TFANG-figure number-period-number of plies concrete house
For total powerstation topographical surveying atural object coding standard, can be divided into two types: total powerstation instrument coding and atural object coding.Total powerstation Instrument observation data type can be divided into atural object coded data row and the atural object measuring point data is capable, and its coding is set can be as shown in Figure 4.And for the atural object coding, its coding is set can be as shown in Figure 5.
Atural object coding as shown in Figure 5, in prism side-play amount coding, coding 6 expression next line detail point observation data prism heights are lifted high 50 centimetres, and coding 19 expression lastrow detail point observation data prism heights are lifted high 50 centimetres; Establish the station at survey station and begin in the coding, coding 7 is for to establish the station at known survey station, and coding 9 is for to establish the station at unknown survey station; In reference mark observation coding, coding 8 is unknown reference mark, and coding 11 is the known control point, by observing the anti-survey station data of asking of this known control point.
In order to realize the seamless access with CASS software, below CASS topographical surveying atural object coding standard is done a brief description.In CASS topographical surveying atural object coding standard, provide two classes coding: in-line coding, guiding coding.
Wherein, the in-line coding that provides is the unique coding of each class atural object in system, for example:
131700, KZD, 20, gc259,2, the mapping base point of layinging of markstone
183300, SXSS, 6,833,0, unguyed ditch
In addition, CASS also provides the Jcode file, provides a cover customizable guiding coding in this document, to make things convenient for the field operation operation, for example:
C07,131700
R15,183300
For unified total powerstation and RTK-GPS atural object coding, the present invention program has customized CASS guiding coding again, thereby has formed total powerstation, external encode that RTK-GPS is unified, formation RTK-GPS, total powerstation and CASS topographical surveying atural object codes match standard.For example, concerning general house, its coding can be:
Closed general house, the FANG-figure number-period-number of plies 700 F01 141101 line houses
Its encoded content is followed successively by:
The explanation of RTK-GPS field operation coding total powerstation field operation coding guiding coding in-line coding type of ground objects atural object attribute atural object
Below just wherein several encoded contents be illustrated, for example:
For the planimetric control point in the reference mark, can be:
131700 nothings of TGD-figure number * * * C07 mapping base point of layinging of markstone
Other reference mark in the reference mark can be:
132100 of BM-figure number * * * C11 are without leveling point
133000 of GPS-figure number * * * C12 are without the GPS reference mark
For the natural river in the water system facility, can be:
HE-figure number-period * * * R01 181101 lines are without water front (permanent stream waterside line)
For the artificical stream in the water system facility, can be:
GOUZ-figure number-period-direction 307 R15 183300 line left side symbol irrigation canals and ditches ditches
JGGZ-figure number-period-direction * * * R16 183310 line left side symbols have been reinforced ditch
The guiding coding of customization can be:
C07,131700
R15,183300
R16,183310
Below describe with regard to the file layout of field operation observation data in the concrete example.
Use the RTK-GPS coding standard, the terrain data file that observes is:
TGD-34?44932.204?68664.179?20.483
ZFANG-40-1?44950.301?68659.815?20.310
ZFANG-40-2?44946.153?68659.922?20.231
ZFANG-40-3?44945.978?68651.943?20.346
Use the total powerstation coding standard, the terrain data file that observes is:
410001+00000001?42....+00000003?43....+00007855?44....+20081104?45....+00620318
410001+00000004?42....+00001088?43....+00000000?44....+00000000?45....+00082952
410002+00000004?42....+00000186?43....+00008323?44....+00000000?45....+00081676
410003+00000005?42....+00001980?43....+00001980
410004+00000007?42....+00001088?43....+00001515
410005+00000012?42....+00000186
110006+00001395?21....+18000040?22....+10637270?31....+00000000?51....+0000+000
410007+00000013?42....+00000101?43....+00001088
110008+00001396?21....+17859490?22....+09615540?31....+00005136?51....+0000+000
DAT point data file in the CASS data file that generates is the file of all detail point coordinate datas of record, and the information of its record is:
P1066,,45337.877,68078.674,12.693
YD boot files in the CASS data file that generates is atural object coding boot files, has recorded the coding of each atural object and has formed the data point period sequence of this atural object, and the information of its record is:
G01,P1353,P1355,P1357,P1359,P1360
Wherein, above-mentioned coding key only is that the coded system in the concrete example is had been described in detail, according to actual needs, can make the coding of fixture body by oneself, thereby the user can formulate according to this coding standard the field operation atural object coding of custom, and need not to remember unfamiliar coding, can increase the dirigibility that field data gathers, make things convenient for the outdoor workers operation, greatly improve operating efficiency.
In addition, having in the integrated landform measuring system of coding RTK-GPS total powerstation of the invention described above, field operation unit 201 can be used as independently, and part is arranged in the field data collecting device, be specially, this field operation unit 201 can comprise two parts: RTK-GPS field operation unit, total powerstation field operation unit, in equipment when RTK-GPS field operation unit is arranged on the collection of RTK-GPS field data, so that when carrying out the collection of RTK-GPS field data, data are encoded, total powerstation field operation unit is arranged in the total powerstation, so that when carrying out the field data collection with total powerstation data are encoded.Other part can be used as one independently system for surveyor.Interface synoptic diagram for the RTK-GPS topographical surveying CASS interface system of surveyor has been shown among Fig. 6 in the concrete example of the present invention, the interface synoptic diagram for the total powerstation topographical surveying CASS interface system of surveyor has been shown among Fig. 8 in the present invention program's the concrete example.
The topomap that conventional codeless RTK-GPS measures, be depicted as finished figure then needs surveyor according to sketch, spends a large amount of work and connects atural object; For example to connect the house in the enlarged drawing, then must manually four points be coupled together, and mark house material.
Adopt the present invention program, according to field operation with the RTK-GPS measuring point of coding, need not the artificial topomap automatically drawn of participating in; The house in the enlarged drawing for example, system can resolve measuring point automatically, and drafting pattern does not need artificial drafting; Greatly improve the work efficiency of data processing, and guaranteed construction quality.
The topomap of conventional codeless total station survey, be depicted as finished figure then needs surveyor according to sketch, spends a large amount of work and connects atural object; For example to connect the house in the enlarged drawing, then must manually four points be coupled together, and mark house material.
Adopt the present invention program, according to field operation with the total powerstation measuring point of coding, need not the artificial topomap automatically drawn of participating in; The house in the enlarged drawing for example, system can resolve measuring point automatically, and drafting pattern does not need artificial drafting; Greatly improve the work efficiency of data processing, and guaranteed construction quality.
The invention described above scheme, form efficient topographical surveying of Total Station RTK-GPS and line project and measured work pattern, it has not only formulated total powerstation, RTK-GPS fieldwork observation coding, fieldwork observation method, and provide unified mode of operation, and special column foot topomap has designed specific interface setting in measuring for line project, formed the total solution of total powerstation, RTK-GPS Data Format Transform, in topographical surveying, be widely used, be with a wide range of applications, can reach following beneficial effect:
One, atural object are code standardized
Gather characteristics according to RTK-GPS and total powerstation field data, innovation has been formulated field data and has been gathered the atural object coding standard, this coding not only can record the measuring point information of atural object, and can record the attribute such as direction, the number of plies, material of atural object, field operation need not skeletonizing, record atural object attribute etc., standardized RTK-GPS and total powerstation field data collecting work pattern.
Two, easily from customization
Atural object is code standardized to be the coding method of having formulated RTK-GPS and the data acquisition of total powerstation field operation atural object, but specifically the coding of each atural object can customize according to user's custom, system provides flexibly, and coding customizes function certainly, therefore the user only needs to formulate according to coding standard the field operation atural object coding of custom, and do not need to remember unfamiliar coding, increase the dirigibility that field data gathers, made things convenient for the outdoor workers operation, greatly improved operating efficiency.
Three, field data collection standardization
According to unified atural object coding, atural object observation procedure, the data acquisition of the outdoor workers that standardized has guaranteed the quality of outdoor workers data acquisition to have reduced the probability that image data is made mistakes; Do not need artificial skeletonizing, reduced the human resources input, and improved the work efficiency of field data acquisition; Guaranteed construction quality from the data acquisition source.
Four, data processing software is integrated
Atural object with standard is encoded to main line, connected the intermediate link of field data collection and data processing, according to this atural object coding standard, atural object observation procedure, CASS atural object coding standard, research and development coding RTK-GPS total powerstation integrated landform measuring system arranged, in data processing, can automatically construct the data structure of each atural object, calculate, process the observation data of various atural objects, automatically generate some data file and the coding boot files of southern CASS software, use this most widely used Software Create topomap.
Five, interior field operation work efficiency improves, and construction quality guarantees
The operational method of total powerstation in topographical surveying is very ripe, all using in each unit, but but in topographical surveying, RTK-GPS can be observed the work standardizations such as various complicated atural objects without any one of a unit formation, formulate the field operation coding standard, and form normalized fieldwork observation pattern, data processing is according to coding standard, need not the field operation skeletonizing, full-automatic topographic mapping, line project column foot topomap, with real a whole set of solution from field operation to interior industry that forms integrated topographic mapping of Total Station, particularly blank especially for the easily column foot map surveying specialty solution of aerial power transmission line, the present invention program has really formed the operational method of the integrated landform mapping of RTK-GPS associating total powerstation, has greatly improved topographic operating flexibility and efficient.
Six, achievement versatility
South CASS topomap Become the picture software is the topomap Become the picture software that is most widely used of field, domestic project construction field of domestic topographical surveying, the present invention program has realized the integrated CASS interface of RTK-GPS associating total powerstation, use CASS and generate the topomap finished product, guaranteed the versatility of topomap finished product.
Above-described embodiments of the present invention only are the detailed descriptions to a preferred embodiment of the present invention, do not consist of the restriction to protection domain of the present invention.Any modification of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included within the claim protection domain of the present invention.