CN102200436B - Real-time kinematic GPS (RTK-GRS) total station integrated topographic surveying method and system with encoded data - Google Patents

Real-time kinematic GPS (RTK-GRS) total station integrated topographic surveying method and system with encoded data Download PDF

Info

Publication number
CN102200436B
CN102200436B CN 201110071921 CN201110071921A CN102200436B CN 102200436 B CN102200436 B CN 102200436B CN 201110071921 CN201110071921 CN 201110071921 CN 201110071921 A CN201110071921 A CN 201110071921A CN 102200436 B CN102200436 B CN 102200436B
Authority
CN
China
Prior art keywords
rtk
gps
total powerstation
coding
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110071921
Other languages
Chinese (zh)
Other versions
CN102200436A (en
Inventor
雷伟刚
王东甫
张小望
柳林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN 201110071921 priority Critical patent/CN102200436B/en
Publication of CN102200436A publication Critical patent/CN102200436A/en
Application granted granted Critical
Publication of CN102200436B publication Critical patent/CN102200436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a real-time kinematic GPS (RTK-GRS) and total station integrated topographic surveying method and system with encoded data. When the data is surveyed outside, data collected by the RTK-GRS and the total station is respectively encoded according to a preset RTK-GRS coding standard and a preset total station coding standard. The function of two devices with high working efficiency is exerted without drawing a sketch map by handmade for saving the human resource. When the office work is processed, the surveying points of the landmarks can be automatically analyzed according to the same preset RTK-GPS coding standard and the same total station coding standard through the observation data with object codes collected outside, An automatic matching is conducted according to the landmark coding coupling standards of the preset total station, the RTK-GPS, a CASS for generating a CASS software interface file, and a topographic map can be automatically drawn by using a CASS software. The defects that a measuring point is searched by person and points are connected one by one by people can be avoided. The t real-time kinematic GPS (RTK-GRS) and total station integrated topographic surveying can be realized and the drafting efficiency can be improved.

Description

The coding integrated landform measuring method of RTK-GPS total powerstation and system are arranged
Technical field
The present invention relates to the power engineering field of measuring technique, particularly a kind of have the coding integrated landform measuring method of RTK-GPS total powerstation and a system.
Background technology
In the at present domestic map surveying technology, general method has two kinds, and a kind of is to adopt total powerstation topographic mapping landform, atural object, and another kind is RTK-GPS(Real-Time Kinematic GPS, dynamically RTK GPS) metering system.
The topographic main method of total powerstation, all detail points of field data acquisition and drafting operation, surveyor calculates all measuring point coordinates of total powerstation, on figure (generally, take AutoCAD as platform) all measuring points of plotting, according to field sketch, in a large amount of detail points, search the measuring point in the sketch, all measuring points that connect one by one each atural object form the topomap sketch.Work pattern and the total powerstation of RTK-GPS are similar, namely observe all detail points, skeletonizing, connect one by one all atural object measuring points according to sketch, form the topomap sketch, sketch with total powerstation and RTK-GPS observation is spliced to form the sketch full figure at last, and ornamenting forms the topomap finished product.The synoptic diagram of using the map surveying scheme of total powerstation mapping in the prior art has been shown among Fig. 1.
In the prior art, most of units are when carrying out topography mapping, all be to use total powerstation to measure, it is less to use the survey the topography unit of figure of RTK-GPS, even if use, also be very simple, and usually just use a kind of measurement the among total powerstation, the RTK-GPS, this greatly reduces the efficient of map surveying.Use this two kinds of mapping modes, field operation is responsible for image data, skeletonizing, and interior industry only is responsible for data are processed, the operation of interior industry, field operation disconnects mutually, in addition, how atural object connects can only rely on outdoor workers manually to draw the atural object sketch, needs the labor intensive resource, correspondingly, when surveyor carries out the data processing, need to contrast all measuring points that field sketch is manually searched each atural object in hundreds and thousands of measuring points on the same day, then line is carried out in pointwise, workload is huge, very easily makes mistakes.
On the other hand, CASS software (a kind of digital topography map Survey Software, by the research and development of southern numeral science and technology company limited) be the most widely software that use in domestic topography mapping field, most units all adopt this software terrain map of survey and drawing, yet this mapping software is the data processing Become the picture software, when carrying out the processing of geography data, can only simply use CASS software measuring point is drawn on the figure, manually connect measuring point again, efficient is very low.
Summary of the invention
For above-mentioned problems of the prior art, the object of the present invention is to provide a kind of have the coding integrated landform measuring method of RTK-GPS total powerstation and system, it can avoid the manpower skeletonizing, realize RTK-GPS associating total powerstation indoor and field integration, automatically, seamlessly carry out software data and process, improve and draw efficient.
For achieving the above object, the present invention by the following technical solutions:
A kind of have a coding RTK-GPS total powerstation integrated landform measuring method, comprises step:
Field operation RTK-GPS associating total powerstation gathers terrain data, and when gathering, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard;
Interior industry is resolved described RTK-GPS coded file data according to described default RTK-GPS coding standard, RTK-GPS coded file data after obtaining resolving, resolve described total powerstation coded file data according to described default total powerstation coding standard, the total powerstation coded file data after obtaining resolving;
According to the total powerstation coded file data after the RTK-GPS coded file data after described default RTK-GPS coding standard, the described parsing, described default total powerstation coding standard, the described parsing, calculate the measuring point coordinate with coding;
Carry out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generate CASS software interface file.
A kind of have a coding RTK-GPS total powerstation integrated landform measuring system, comprising:
The field operation unit, be used for when field operation RTK-GPS associating total powerstation gathers terrain data, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard.
The data importing unit is used for importing the coded file data, and described coded file data comprise RTK-GPS coded file data, total powerstation coded file data;
The resolution unit that is connected with described data importing unit, be used for resolving described RTK-GPS coded file data according to default RTK-GPS coding standard, RTK-GPS coded file data after obtaining resolving, resolve described total powerstation coded file data according to default total powerstation coding standard, the total powerstation coded file data after obtaining resolving;
The measuring point computing unit that is connected with described resolution unit, be used for according to the total powerstation coded file data after the RTK-GPS coded file data after described default RTK-GPS coding standard, the described parsing, described default total powerstation coding standard, the described parsing, calculate the measuring point coordinate with coding;
The interface document generation unit that is connected with described measuring point computing unit is used for carrying out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generates CASS software interface file.
Scheme according to the invention described above, it is according to total powerstation, the characteristics that RTK-GPS topographical surveying and data are processed, the advantage of performance RTK-GPS in field operation is measured, fill up the topographic blank of RTK-GPS, when the field operation measurement data, according to default RTK-GPS coding standard, default total powerstation coding standard is respectively to using RTK-GPS, the data that total powerstation gathers are encoded, brought into play the high-efficient homework of two kinds of instruments, and need not manpower and draw the atural object sketch, human resources have been saved, when interior industry is processed, the observation data with the atural object coding according to field data acquisition, according to identical default RTK-GPS coding standard, default total powerstation coding standard is resolved the atural object measuring point automatically, can be according to default total powerstation, RTK-GPS, CASS atural object codes match standard is carried out Auto-matching and is generated CASS software interface file, and the automatic topographic mapping of application CASS software, avoided manually searching measuring point, line is carried out in artificial pointwise, realize the integrated topographical surveying of RTK-GPS associating total powerstation, improved drafting efficient.
Description of drawings
Fig. 1 is the synoptic diagram of using the map surveying scheme of total powerstation mapping in the prior art;
Fig. 2 is the schematic flow sheet that the integrated landform measuring method of coding RTK-GPS total powerstation embodiment is arranged of the present invention;
Fig. 3 is the structural representation that the integrated landform measuring system of coding RTK-GPS total powerstation embodiment is arranged of the present invention;
Fig. 4 is the synoptic diagram of a total powerstation instrument coding in the concrete example;
Fig. 5 is the synoptic diagram of the atural object coding of a total powerstation in the concrete example;
Fig. 6 is the interface synoptic diagram of RTK-GPS topographical surveying CASS interface system in the concrete example;
Fig. 7 is the interface synoptic diagram of total powerstation topographical surveying CASS interface system in the concrete example.
Embodiment
Below with one of them preferred embodiment the present invention program is described in detail.
As shown in Figure 2, be the schematic flow sheet of the flat section survey method for drafting of RTK-GPS of the present invention embodiment.As shown in Figure 2, it comprises step:
Step S101: field operation RTK-GPS associating total powerstation gathers terrain data, and when image data, according to default coding standard the data that gather are encoded, be specially, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard, enter step S102;
Step S102: interior industry is according to above-mentioned default coding standard, resolve above-mentioned coded file data, coded file data after obtaining resolving, be specially, interior industry is resolved above-mentioned RTK-GPS coded file data according to above-mentioned default RTK-GPS coding standard, and the RTK-GPS coded file data after obtaining resolving are resolved above-mentioned total powerstation coded file data according to above-mentioned default total powerstation coding standard, total powerstation coded file data after obtaining resolving enter step S103;
Step S103: according to the coded file data after above-mentioned default coding standard, the above-mentioned parsing, calculating is with the measuring point coordinate of coding, be specially, according to the total powerstation coded file data after the RTK-GPS coded file data after above-mentioned default RTK-GPS coding standard, the above-mentioned parsing, above-mentioned default total powerstation coding standard, the above-mentioned parsing, calculating enters step S104 with the measuring point coordinate of coding;
Step S104: carry out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generate CASS software interface file.
Scheme according to the invention described above, it is by formulating default RTK-GPS coding standard, default total powerstation coding standard, the field operation data acquisition modes is standardized, based on the observation data with coding, during enforcement, field operation does not need skeletonizing, when interior industry is processed, the observation data with the atural object coding according to field data acquisition, according to identical default RTK-GPS coding standard, default total powerstation coding standard is resolved the atural object measuring point automatically, can be according to default total powerstation, RTK-GPS, CASS atural object codes match standard is carried out Auto-matching and is generated CASS software interface file, and the automatic topographic mapping of application CASS software, do not need artificial participation, realized the efficient processing to data, finally realized unified atural object coding standard, standardization ground carries out the field data collection, realize automatically, efficiently, seamless software data is processed, and forms the integrated measurement scheme of RTK-GPS associating total powerstation.
In addition, high, the not intensive area in the house, be unfavorable for Setting Station of Total Station Instrument, efficient was very low when the application total powerstation was measured, work efficiency can be improved more than 50% and use the RTK-GPS mapping, and the invention described above scheme has realized that the associating of RTK-GPS and total powerstation is integrated, has greatly improved the efficient of topomap mapping.
When application RTK-GPS, total powerstation carried out the field data collection, the specific implementation of field data observation can be to adopt existing mode in the prior art, does not repeat them here.
Default coding standard of the present invention, it is the integrated coding standard of total powerstation and RTK-GPS, during formulation, the difference of the characteristics of measuring for total powerstation, RTK-GPS, formulate respectively corresponding coding standard, that is, and according to the collection characteristics of RTK-GPS field data, formulate RTK-GPS coding standard (being above-mentioned default RTK-GPS coding standard), the atural object coding that comprises when for example the RTK-GPS field operation is measured, atural object figure number, atural object period, direction attribute information etc.; Collection characteristics according to the total powerstation field data, formulate total powerstation coding standard (being above-mentioned default total powerstation coding standard), the job information that comprises when measuring such as the total powerstation field operation, known stake data, default prism height, prism side-play amount, survey station establish that station beginning, stake position observation, rear apparent direction, detail point begin, atural object is observed the information such as begin, according to this RTK-GPS coding standard and total powerstation coding standard, not only can record the measuring point information of atural object, and the attributes such as direction, the number of plies, material of record atural object.Field operation is when using certain mode image data, the coding standard corresponding according to this mode, directly the data that gather are inputted according to this coding standard, perhaps equipment behind the input information of correspondence is encoded according to this coding standard voluntarily, concrete implementation does not repeat them here.
Because the RTK-GPS metering system is different from the total station survey mode, therefore, for its different measuring characteristic, above-mentioned with formulated two the cover coding standards encode respectively to describe, in order to realize the automatic drafting of topomap, need to mate these two kinds of coding standards, so that these two kinds of coding standards can collaborative work.In the present invention program, by the mode of the corresponding same CASS atural object coding of these two kinds of coding standards is mated.
The concrete mode that adopts can be, formulate total powerstation, RTK-GPS, CASS atural object codes match standard (is above-mentioned default total powerstation, RTK-GPS, CASS atural object codes match standard), during concrete coupling, by resolving the CASS coding standard, realize the coupling of RTK-GPS coding standard and CASS coding standard, and the coupling of total powerstation coding standard and CASS coding standard, namely by the RTK-GPS coding standard is mated with the mode of the corresponding same CASS coding standard of total powerstation coding standard, during specific implementation, customizable CASS guiding coding is to form total powerstation, the external encode that RTK-GPS is unified.
Calculating the measuring point coordinate time with coding in above-mentioned steps S103, is to calculate in conjunction with coding, and concrete account form can be to adopt existing mode in the prior art, does not repeat them here.
According to the invention described above coding RTK-GPS total powerstation integrated landform measuring method arranged, the present invention also provides a kind of integrated landform measuring system of coding RTK-GPS total powerstation that has, as shown in Figure 3, be the structural representation that the integrated landform measuring system of coding RTK-GPS total powerstation embodiment is arranged of the present invention, it includes:
Data importing unit 202 is used for importing the coded file data, and the coded file data here comprise RTK-GPS coded file data, total powerstation coded file data;
The resolution unit 203 that is connected with data importing unit 202, be used for resolving above-mentioned RTK-GPS coded file data according to default RTK-GPS coding standard, RTK-GPS coded file data after obtaining resolving, resolve above-mentioned total powerstation coded file data according to default total powerstation coding standard, the total powerstation coded file data after obtaining resolving;
The measuring point computing unit 204 that is connected with resolution unit 203, be used for according to the total powerstation coded file data after the RTK-GPS coded file data after above-mentioned default RTK-GPS coding standard, the above-mentioned parsing, above-mentioned default total powerstation coding standard, the above-mentioned parsing, calculate the measuring point coordinate with coding;
The interface document generation unit 205 that is connected with measuring point computing unit 204 is used for carrying out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generates CASS software interface file.
In addition, of the present invention have the integrated landform measuring system of coding RTK-GPS total powerstation to include:
Field operation unit 201, be used for when field operation RTK-GPS associating total powerstation gathers terrain data, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard.
Scheme according to the invention described above, it is by formulating default RTK-GPS coding standard, default total powerstation coding standard, the field operation data acquisition modes is standardized, based on the observation data with coding, during enforcement, field operation does not need skeletonizing, when interior industry is processed, the observation data with the atural object coding according to field data acquisition, according to identical default RTK-GPS coding standard, default total powerstation coding standard is resolved the atural object measuring point automatically, can be according to default total powerstation, RTK-GPS, CASS atural object codes match standard is carried out Auto-matching and is generated CASS software interface file, and the automatic topographic mapping of application CASS software, do not need artificial participation, realized the efficient processing to data, finally realized unified atural object coding standard, standardization ground carries out the field data collection, realize automatically, efficiently, seamless software data is processed, and forms the integrated measurement scheme of RTK-GPS associating total powerstation.
In addition, high, the not intensive area in the house, be unfavorable for Setting Station of Total Station Instrument, efficient was very low when the application total powerstation was measured, work efficiency can be improved more than 50% and use the RTK-GPS mapping, and the invention described above scheme has realized that the associating of RTK-GPS and total powerstation is integrated, has greatly improved the efficient of topomap mapping.
When application RTK-GPS, total powerstation carried out the field data collection, the specific implementation of field data observation can be to adopt existing mode in the prior art, does not repeat them here.
Default coding standard of the present invention, it is the integrated coding standard of total powerstation and RTK-GPS, during formulation, the difference of the characteristics of measuring for total powerstation, RTK-GPS, formulate respectively corresponding coding standard, that is, and according to the collection characteristics of RTK-GPS field data, formulate RTK-GPS coding standard (being above-mentioned default RTK-GPS coding standard), the atural object coding that comprises when for example the RTK-GPS field operation is measured, atural object figure number, atural object period, direction attribute information etc.; Collection characteristics according to the total powerstation field data, formulate total powerstation coding standard (being above-mentioned default total powerstation coding standard), the job information that comprises when measuring such as the total powerstation field operation, known stake data, default prism height, prism side-play amount, survey station establish that station beginning, a stake observation, rear apparent direction, detail point begin, atural object is observed the information such as begin.According to this RTK-GPS coding standard and total powerstation coding standard, not only can record the measuring point information of atural object, and the attributes such as direction, the number of plies, material of record atural object.Field operation is when using certain mode image data, the coding standard corresponding according to this mode, directly the data that gather are inputted according to this coding standard, perhaps equipment behind the input information of correspondence is encoded according to this coding standard voluntarily, concrete implementation does not repeat them here.
Because the RTK-GPS metering system is different from the total station survey mode, therefore, for its different measuring characteristic, above-mentioned with formulated two the cover coding standards encode respectively to describe, in order to realize the automatic drafting of topomap, need to mate these two kinds of coding standards, so that these two kinds of coding standards can collaborative work.In the present invention program, by the mode of the corresponding same CASS atural object coding of these two kinds of coding standards is mated.
The concrete mode that adopts can be, formulate total powerstation, RTK-GPS, CASS atural object codes match standard (is above-mentioned default total powerstation, RTK-GPS, CASS atural object codes match standard), during concrete coupling, by resolving the CASS coding standard, realize the coupling of RTK-GPS coding standard and CASS coding standard, and the coupling of total powerstation coding standard and CASS coding standard, namely by the RTK-GPS coding standard is mated with the mode of the corresponding same CASS coding standard of total powerstation coding standard, during specific implementation, customizable CASS guiding coding is to form total powerstation, the external encode that RTK-GPS is unified.
At the measuring point coordinate time that above-mentioned steps measuring point computing unit 204 calculates with coding, be to calculate in conjunction with coding, concrete account form can be to adopt existing mode in the prior art, does not repeat them here.
In addition, considering interior industry when the coded file data are processed, should be that standard, complete encoded data files are processed, and therefore, system of the present invention can also comprise:
Inspection unit 2012 is used for described coded file data are checked, and judges whether wrong information of these coded file data according to check result, if wrong information, export this error message, if error-free information then imports described coded file data by described data importing unit 202
Inspection unit 2012 is when checking the coded file data, the concrete scope of examination can be: inspection of stake etc. before and after the inspection of data integrity, the column foot landform, except these, can also check other guide, according to different needs, the different scopes of examination can be set, not repeat them here.
According to the invention described above the coding integrated landform measuring method of RTK-GPS total powerstation and system arranged, below just be elaborated with one of them concrete example of each default coding standard.
At first, for RTK-GPS topographical surveying atural object coding standard, its encoded content is followed successively by: atural object coding-atural object figure number-atural object period-direction attribute.Below just list the coding of several atural objects according to this atural object coding standard:
⑴ reference mark:
1. planimetric control point:
The TGD-figure number mapping base point of layinging of markstone
2. other reference mark:
BM-figure number leveling point
GPS-figure number GPS reference mark
⑵ water system facility:
1. natural river:
HE-figure number-period water front (permanent stream waterside line)
2. artificical stream:
GOUZ-figure number-period-direction irrigation canals and ditches ditch
GGOU-figure number-period-direction two-wire hondo the right
⑶ settlement place:
1. general house:
The general house of FANG-figure number-period-number of plies
TFANG-figure number-period-number of plies concrete house
For total powerstation topographical surveying atural object coding standard, can be divided into two types: total powerstation instrument coding and atural object coding.Total powerstation Instrument observation data type can be divided into atural object coded data row and the atural object measuring point data is capable, and its coding is set can be as shown in Figure 4.And for the atural object coding, its coding is set can be as shown in Figure 5.
Atural object coding as shown in Figure 5, in prism side-play amount coding, coding 6 expression next line detail point observation data prism heights are lifted high 50 centimetres, and coding 19 expression lastrow detail point observation data prism heights are lifted high 50 centimetres; Establish the station at survey station and begin in the coding, coding 7 is for to establish the station at known survey station, and coding 9 is for to establish the station at unknown survey station; In reference mark observation coding, coding 8 is unknown reference mark, and coding 11 is the known control point, by observing the anti-survey station data of asking of this known control point.
In order to realize the seamless access with CASS software, below CASS topographical surveying atural object coding standard is done a brief description.In CASS topographical surveying atural object coding standard, provide two classes coding: in-line coding, guiding coding.
Wherein, the in-line coding that provides is the unique coding of each class atural object in system, for example:
131700, KZD, 20, gc259,2, the mapping base point of layinging of markstone
183300, SXSS, 6,833,0, unguyed ditch
In addition, CASS also provides the Jcode file, provides a cover customizable guiding coding in this document, to make things convenient for the field operation operation, for example:
C07,131700
R15,183300
For unified total powerstation and RTK-GPS atural object coding, the present invention program has customized CASS guiding coding again, thereby has formed total powerstation, external encode that RTK-GPS is unified, formation RTK-GPS, total powerstation and CASS topographical surveying atural object codes match standard.For example, concerning general house, its coding can be:
Closed general house, the FANG-figure number-period-number of plies 700 F01 141101 line houses
Its encoded content is followed successively by:
The explanation of RTK-GPS field operation coding total powerstation field operation coding guiding coding in-line coding type of ground objects atural object attribute atural object
Below just wherein several encoded contents be illustrated, for example:
For the planimetric control point in the reference mark, can be:
131700 nothings of TGD-figure number * * * C07 mapping base point of layinging of markstone
Other reference mark in the reference mark can be:
132100 of BM-figure number * * * C11 are without leveling point
133000 of GPS-figure number * * * C12 are without the GPS reference mark
For the natural river in the water system facility, can be:
HE-figure number-period * * * R01 181101 lines are without water front (permanent stream waterside line)
For the artificical stream in the water system facility, can be:
GOUZ-figure number-period-direction 307 R15 183300 line left side symbol irrigation canals and ditches ditches
JGGZ-figure number-period-direction * * * R16 183310 line left side symbols have been reinforced ditch
The guiding coding of customization can be:
C07,131700
R15,183300
R16,183310
Below describe with regard to the file layout of field operation observation data in the concrete example.
Use the RTK-GPS coding standard, the terrain data file that observes is:
TGD-34?44932.204?68664.179?20.483
ZFANG-40-1?44950.301?68659.815?20.310
ZFANG-40-2?44946.153?68659.922?20.231
ZFANG-40-3?44945.978?68651.943?20.346
Use the total powerstation coding standard, the terrain data file that observes is:
410001+00000001?42....+00000003?43....+00007855?44....+20081104?45....+00620318
410001+00000004?42....+00001088?43....+00000000?44....+00000000?45....+00082952
410002+00000004?42....+00000186?43....+00008323?44....+00000000?45....+00081676
410003+00000005?42....+00001980?43....+00001980
410004+00000007?42....+00001088?43....+00001515
410005+00000012?42....+00000186
110006+00001395?21....+18000040?22....+10637270?31....+00000000?51....+0000+000
410007+00000013?42....+00000101?43....+00001088
110008+00001396?21....+17859490?22....+09615540?31....+00005136?51....+0000+000
DAT point data file in the CASS data file that generates is the file of all detail point coordinate datas of record, and the information of its record is:
P1066,,45337.877,68078.674,12.693
YD boot files in the CASS data file that generates is atural object coding boot files, has recorded the coding of each atural object and has formed the data point period sequence of this atural object, and the information of its record is:
G01,P1353,P1355,P1357,P1359,P1360
Wherein, above-mentioned coding key only is that the coded system in the concrete example is had been described in detail, according to actual needs, can make the coding of fixture body by oneself, thereby the user can formulate according to this coding standard the field operation atural object coding of custom, and need not to remember unfamiliar coding, can increase the dirigibility that field data gathers, make things convenient for the outdoor workers operation, greatly improve operating efficiency.
In addition, having in the integrated landform measuring system of coding RTK-GPS total powerstation of the invention described above, field operation unit 201 can be used as independently, and part is arranged in the field data collecting device, be specially, this field operation unit 201 can comprise two parts: RTK-GPS field operation unit, total powerstation field operation unit, in equipment when RTK-GPS field operation unit is arranged on the collection of RTK-GPS field data, so that when carrying out the collection of RTK-GPS field data, data are encoded, total powerstation field operation unit is arranged in the total powerstation, so that when carrying out the field data collection with total powerstation data are encoded.Other part can be used as one independently system for surveyor.Interface synoptic diagram for the RTK-GPS topographical surveying CASS interface system of surveyor has been shown among Fig. 6 in the concrete example of the present invention, the interface synoptic diagram for the total powerstation topographical surveying CASS interface system of surveyor has been shown among Fig. 8 in the present invention program's the concrete example.
The topomap that conventional codeless RTK-GPS measures, be depicted as finished figure then needs surveyor according to sketch, spends a large amount of work and connects atural object; For example to connect the house in the enlarged drawing, then must manually four points be coupled together, and mark house material.
Adopt the present invention program, according to field operation with the RTK-GPS measuring point of coding, need not the artificial topomap automatically drawn of participating in; The house in the enlarged drawing for example, system can resolve measuring point automatically, and drafting pattern does not need artificial drafting; Greatly improve the work efficiency of data processing, and guaranteed construction quality.
The topomap of conventional codeless total station survey, be depicted as finished figure then needs surveyor according to sketch, spends a large amount of work and connects atural object; For example to connect the house in the enlarged drawing, then must manually four points be coupled together, and mark house material.
Adopt the present invention program, according to field operation with the total powerstation measuring point of coding, need not the artificial topomap automatically drawn of participating in; The house in the enlarged drawing for example, system can resolve measuring point automatically, and drafting pattern does not need artificial drafting; Greatly improve the work efficiency of data processing, and guaranteed construction quality.
The invention described above scheme, form efficient topographical surveying of Total Station RTK-GPS and line project and measured work pattern, it has not only formulated total powerstation, RTK-GPS fieldwork observation coding, fieldwork observation method, and provide unified mode of operation, and special column foot topomap has designed specific interface setting in measuring for line project, formed the total solution of total powerstation, RTK-GPS Data Format Transform, in topographical surveying, be widely used, be with a wide range of applications, can reach following beneficial effect:
One, atural object are code standardized
Gather characteristics according to RTK-GPS and total powerstation field data, innovation has been formulated field data and has been gathered the atural object coding standard, this coding not only can record the measuring point information of atural object, and can record the attribute such as direction, the number of plies, material of atural object, field operation need not skeletonizing, record atural object attribute etc., standardized RTK-GPS and total powerstation field data collecting work pattern.
Two, easily from customization
Atural object is code standardized to be the coding method of having formulated RTK-GPS and the data acquisition of total powerstation field operation atural object, but specifically the coding of each atural object can customize according to user's custom, system provides flexibly, and coding customizes function certainly, therefore the user only needs to formulate according to coding standard the field operation atural object coding of custom, and do not need to remember unfamiliar coding, increase the dirigibility that field data gathers, made things convenient for the outdoor workers operation, greatly improved operating efficiency.
Three, field data collection standardization
According to unified atural object coding, atural object observation procedure, the data acquisition of the outdoor workers that standardized has guaranteed the quality of outdoor workers data acquisition to have reduced the probability that image data is made mistakes; Do not need artificial skeletonizing, reduced the human resources input, and improved the work efficiency of field data acquisition; Guaranteed construction quality from the data acquisition source.
Four, data processing software is integrated
Atural object with standard is encoded to main line, connected the intermediate link of field data collection and data processing, according to this atural object coding standard, atural object observation procedure, CASS atural object coding standard, research and development coding RTK-GPS total powerstation integrated landform measuring system arranged, in data processing, can automatically construct the data structure of each atural object, calculate, process the observation data of various atural objects, automatically generate some data file and the coding boot files of southern CASS software, use this most widely used Software Create topomap.
Five, interior field operation work efficiency improves, and construction quality guarantees
The operational method of total powerstation in topographical surveying is very ripe, all using in each unit, but but in topographical surveying, RTK-GPS can be observed the work standardizations such as various complicated atural objects without any one of a unit formation, formulate the field operation coding standard, and form normalized fieldwork observation pattern, data processing is according to coding standard, need not the field operation skeletonizing, full-automatic topographic mapping, line project column foot topomap, with real a whole set of solution from field operation to interior industry that forms integrated topographic mapping of Total Station, particularly blank especially for the easily column foot map surveying specialty solution of aerial power transmission line, the present invention program has really formed the operational method of the integrated landform mapping of RTK-GPS associating total powerstation, has greatly improved topographic operating flexibility and efficient.
Six, achievement versatility
South CASS topomap Become the picture software is the topomap Become the picture software that is most widely used of field, domestic project construction field of domestic topographical surveying, the present invention program has realized the integrated CASS interface of RTK-GPS associating total powerstation, use CASS and generate the topomap finished product, guaranteed the versatility of topomap finished product.
Above-described embodiments of the present invention only are the detailed descriptions to a preferred embodiment of the present invention, do not consist of the restriction to protection domain of the present invention.Any modification of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included within the claim protection domain of the present invention.

Claims (9)

1. one kind has the integrated landform measuring method of coding RTK-GPS total powerstation, it is characterized in that, comprises step:
Field operation RTK-GPS associating total powerstation gathers terrain data, and when gathering, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard;
Interior industry is resolved described RTK-GPS coded file data according to described default RTK-GPS coding standard, RTK-GPS coded file data after obtaining resolving, resolve described total powerstation coded file data according to described default total powerstation coding standard, the total powerstation coded file data after obtaining resolving;
According to the total powerstation coded file data after the RTK-GPS coded file data after described default RTK-GPS coding standard, the described parsing, described default total powerstation coding standard, the described parsing, calculate the measuring point coordinate with coding;
Carry out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generate CASS software interface file.
2. according to claim 1 have a coding RTK-GPS total powerstation integrated landform measuring method, it is characterized in that, also comprise step: resolve the CASS coding, according to the CASS coding after resolving, described default RTK-GPS coding standard, described default total powerstation coding standard customization CASS guiding coding, generate described default total powerstation, RTK-GPS, CASS atural object codes match standard.
3. according to claim 1 and 2 have a coding RTK-GPS total powerstation integrated landform measuring method, described coded file data comprise the atural object attribute, and described atural object attribute comprises wide, the height of atural object of length, the atural object of measuring point information, the atural object of atural object, the material properties of atural object.
4. according to claim 1 and 2 have a coding RTK-GPS total powerstation integrated landform measuring method, it is characterized in that described CASS software interface file comprises period data file, figure number data file, atural object coding boot files.
5. one kind has the integrated landform measuring system of coding RTK-GPS total powerstation, it is characterized in that, comprising:
The field operation unit, be used for when field operation RTK-GPS associating total powerstation gathers terrain data, according to default RTK-GPS coding standard the data that gather by RTK-GPS are encoded, obtain RTK-GPS coded file data, to encoding by the data of total powerstation collection, obtain total powerstation coded file data according to default total powerstation coding standard;
The data importing unit is used for importing the coded file data, and described coded file data comprise RTK-GPS coded file data, total powerstation coded file data;
The resolution unit that is connected with described data importing unit, be used for resolving described RTK-GPS coded file data according to default RTK-GPS coding standard, RTK-GPS coded file data after obtaining resolving, resolve described total powerstation coded file data according to default total powerstation coding standard, the total powerstation coded file data after obtaining resolving;
The measuring point computing unit that is connected with described resolution unit, be used for according to the total powerstation coded file data after the RTK-GPS coded file data after described default RTK-GPS coding standard, the described parsing, described default total powerstation coding standard, the described parsing, calculate the measuring point coordinate with coding;
The interface document generation unit that is connected with described measuring point computing unit is used for carrying out Auto-matching according to default total powerstation, RTK-GPS, CASS atural object codes match standard, generates CASS software interface file.
6. according to claim 5 have a coding RTK-GPS total powerstation integrated landform measuring system, it is characterized in that, described field operation unit comprises: RTK-GPS field operation unit, total powerstation field operation unit, described RTK-GPS field operation unit is arranged in the RTK-GPS field data acquisition equipment, and described total powerstation field operation unit is arranged in the total powerstation.
7. according to claim 5 or 6 described coding RTK-GPS total powerstation integrated landform measuring system arranged, it is characterized in that, also comprise:
The inspection unit that is connected with described data importing unit, be used for described coded file data are checked, and judge whether wrong information of these coded file data according to check result, if wrong information, export this error message, if error-free information then imports described coded file data by described data importing unit.
8. according to claim 5 or 6 described coding RTK-GPS total powerstation integrated landform measuring system arranged, it is characterized in that, described coded file data comprise the atural object attribute, and described atural object attribute comprises wide, the height of atural object of length, the atural object of measuring point information, the atural object of atural object, the material properties of atural object.
9. according to claim 5 or 6 described coding RTK-GPS total powerstation integrated landform measuring system arranged, it is characterized in that described CASS software interface file comprises period data file, figure number data file, atural object coding boot files.
CN 201110071921 2011-03-24 2011-03-24 Real-time kinematic GPS (RTK-GRS) total station integrated topographic surveying method and system with encoded data Active CN102200436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110071921 CN102200436B (en) 2011-03-24 2011-03-24 Real-time kinematic GPS (RTK-GRS) total station integrated topographic surveying method and system with encoded data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110071921 CN102200436B (en) 2011-03-24 2011-03-24 Real-time kinematic GPS (RTK-GRS) total station integrated topographic surveying method and system with encoded data

Publications (2)

Publication Number Publication Date
CN102200436A CN102200436A (en) 2011-09-28
CN102200436B true CN102200436B (en) 2013-05-29

Family

ID=44661294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110071921 Active CN102200436B (en) 2011-03-24 2011-03-24 Real-time kinematic GPS (RTK-GRS) total station integrated topographic surveying method and system with encoded data

Country Status (1)

Country Link
CN (1) CN102200436B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102495928A (en) * 2011-12-07 2012-06-13 中冶成都勘察研究总院有限公司 Automatic mapping method based on surveying and mapping software computer-aided schematic system (CASS)
CN104359458A (en) * 2014-11-17 2015-02-18 芒市海华开发有限公司 Method for performing geologic and topographic measurement by utilizing High One quad-rotor plane
CN105256847B (en) * 2015-10-20 2017-12-05 中国水利水电第七工程局有限公司 A kind of submerged structure positioning transfer measurement apparatus and method
CN105824894A (en) * 2016-03-11 2016-08-03 广州市中海达测绘仪器有限公司 Method and system for real-time mapping of integrated surveying and mapping for indoor and field works
CN106248060A (en) * 2016-07-21 2016-12-21 北京道亨时代科技有限公司 A kind of coded method of the handhold GPS multimetering for power circuit exploration
CN107784920A (en) * 2016-08-30 2018-03-09 上海勘测设计研究院有限公司 Mapping atural object decoding method based on southern CASS drawing formation system, system
US10982984B2 (en) 2016-10-27 2021-04-20 Ysi, Inc. Technique to measure the distance between stations using DGPS/RTK GPS in the velocity area method (stationary) with an acoustic doppler current profiler

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6199000B1 (en) * 1998-07-15 2001-03-06 Trimble Navigation Limited Methods and apparatus for precision agriculture operations utilizing real time kinematic global positioning system systems
CN201173773Y (en) * 2008-03-14 2008-12-31 河南工程学院 GPS RTK total station type measuring apparatus
CN101452072A (en) * 2008-12-26 2009-06-10 东南大学 Electronic information system for earth monitor and method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4276458B2 (en) * 2003-03-31 2009-06-10 株式会社パスコ Survey method by VRS-TS method
JP4631459B2 (en) * 2005-02-18 2011-02-16 株式会社デンソー Map display control device and map display control program.

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6199000B1 (en) * 1998-07-15 2001-03-06 Trimble Navigation Limited Methods and apparatus for precision agriculture operations utilizing real time kinematic global positioning system systems
CN201173773Y (en) * 2008-03-14 2008-12-31 河南工程学院 GPS RTK total station type measuring apparatus
CN101452072A (en) * 2008-12-26 2009-06-10 东南大学 Electronic information system for earth monitor and method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2004-301598A 2004.10.26
JP特开2006-226871A 2006.08.31

Also Published As

Publication number Publication date
CN102200436A (en) 2011-09-28

Similar Documents

Publication Publication Date Title
CN102200436B (en) Real-time kinematic GPS (RTK-GRS) total station integrated topographic surveying method and system with encoded data
CN106779417A (en) The collection of engineering investigation information digitalization, management and integrated application method
CN101452072B (en) Electronic information system for earth monitor and method thereof
CN107093206A (en) The method modeled using 3D laser scanner technique fast Bs IM
CN102235858A (en) Coded real-time kinematic global positioning system (RTK-GPS) plane section measuring method and system
CN103699634A (en) Database creation method and database creation system for one-stop pipeline detection
CN104679822B (en) A kind of geographical national conditions fieldwork measurement method
CN102750413B (en) Data processing and mapping method of topographic surveying of electric transmission line tower positions
CN104833347B (en) Irrigated area canal system investigation method based on GPS location and survey system
CN104820759A (en) Data acquisition method and system of pipeline facility
Xu Application of GPS-RTK technology in the land change survey
CN106247936A (en) Earth clearance object research method based on 3 D laser scanning and investigating system
CN105824894A (en) Method and system for real-time mapping of integrated surveying and mapping for indoor and field works
CN113626455A (en) Method and device for updating picture library in linkage manner, electronic equipment and storage medium
CN109885608A (en) A kind of canal business system of artificial intelligence big data
CN101846512B (en) Method for implementing land patrol
CN108984769A (en) A kind of multi-coordinate fusion method based on coordinate fitting
CN111460623B (en) Real-time acquisition and processing method and system for mapping operation data
CN103020327B (en) Land use intensively investigation real-time data acquisition terminal system and acquisition method thereof
CN204613941U (en) The data acquisition system (DAS) of pipeline facility
CN110967705A (en) GPS range finder and measuring method thereof
CN110068315A (en) A kind of KARST CAVES IN space integration measuring device and measuring method
CN115962755A (en) Earth and stone calculation method based on unmanned aerial vehicle oblique photography technology
CN206557394U (en) Coordinate determination system
CN103996991B (en) Selection method and system for transmission line of electricity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Applicant after: Guangdong Electric Power Design Institute of CEEC

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Applicant before: Guangdong Electric Power Design Institute

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE TO: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Company limited of China Energy Engineering Group Guangdong Electric Power Design Institute

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: Guangdong Electric Power Design Institute of CEEC