CN103188720A - Terminal link disconnection method based on network load and terminal - Google Patents

Terminal link disconnection method based on network load and terminal Download PDF

Info

Publication number
CN103188720A
CN103188720A CN2011104455093A CN201110445509A CN103188720A CN 103188720 A CN103188720 A CN 103188720A CN 2011104455093 A CN2011104455093 A CN 2011104455093A CN 201110445509 A CN201110445509 A CN 201110445509A CN 103188720 A CN103188720 A CN 103188720A
Authority
CN
China
Prior art keywords
load
link load
terminal
forward link
base station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104455093A
Other languages
Chinese (zh)
Inventor
梅玉平
黄云飞
王庆扬
陆健贤
闵锐
赵旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Telecom Corp Ltd
Original Assignee
China Telecom Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Telecom Corp Ltd filed Critical China Telecom Corp Ltd
Priority to CN2011104455093A priority Critical patent/CN103188720A/en
Publication of CN103188720A publication Critical patent/CN103188720A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a terminal link disconnection method based on a network load and a terminal. A network side measures a reverse link load and a forward link load and transmits the reverse link load and the forward link load to the terminal; when the terminal does not transmit uplink data or receives downlink data within a certain time threshold, and the reverse link load and the forward link load are greater than a threshold value, the terminal initiates a link disconnection request to a base station; an air interface link is disconnected; and the terminal enters into a dormant state. According to the method and the terminal, the link disconnection request is initiated actively according to a judgment that the forward load and the reverse load exceed the threshold value, the air interface code word occupation is reduced, the service user number is increased in a certain time period, and the air interface signaling load is reduced.

Description

A kind of terminal of load Network Based is torn chain method and terminal thereof open
Technical field
The present invention relates to mobile internet technical field, the terminal that relates in particular to a kind of load Network Based is torn chain method and terminal thereof open.
Background technology
The extensive expansion of popularizing development and data service application fast of the mobile intelligent terminal of using along with bearer service, the mobile subscriber uses data service more and more, data service permeability fast lifting, mobile Internet has not rested on the conceptual phase, becomes more and more general application but come into masses.Intelligent meter data recording business in mobile QQ, microblogging and the sector application is respectively the public and the typical mobile Internet applied business of industry user.These business generally present low discharge, long online feature.
Because low discharge is long online, it is little that the user transmits data volume, but need to keep PPP to connect, and maintain line states by modes such as heartbeats; Simultaneously, intelligent terminal can be after free of data transmits fixedly duration, and initiatively the dismounting link of eating dishes without rice or wine enters dormant state.Therefore, this will cause producing a large amount of pagings, and set up continually, removes the link of eating dishes without rice or wine, thereby signaling traffic load is doubled and redoubled.For example, in the subregion such as the campus present increase severely 4,5 times situation of paging capacity demand, be called as the signaling storm, even cause the network base station dilatation.And signaling belongs to control message, and its flow is not counted in customer flow, so its flow and relevant dilatation do not produce direct professional income.
Mobile Internet such as QQ are professional to be extensive use of, and means at regional area such as campus etc. and will assemble a large number of users under a base station cell.Though each customer flow demand is little, need the residential quarter to support the user who activates simultaneously sharply to rise, bring the obvious noise lifting simultaneously.For the code word of distinguishing the user (as the Walsh sign indicating number of CDMA, Macindex etc.) and noise rise thresholding, limited situation will appear.
The following problem of mobile Internet business to existing between mobile network's signaling capacity code word and the noise rise: for identical number of users, as reducing signaling capacity, then user's state of activation should be maintained long time, but mean and eating dishes without rice or wine, excited users will take code source for a long time, and network noise also will maintain a higher level; Take as reducing code word, increase the service-user number in the certain time length scope, then should eat dishes without rice or wine as early as possible the user to be moved to dormant state from state of activation, the dismounting link of eating dishes without rice or wine, reducing the code word of eating dishes without rice or wine takies, but this will make the user set up, remove the link of eating dishes without rice or wine continually inevitably, sharply increase the space interface signaling load.
Summary of the invention
In view of this, the technical problem that the present invention will solve provides a kind of chain method of tearing open of load Network Based, can be supreme at offered load height and terminal, initiatively initiate to tear open the chain request under the situation of downlink data.
A kind of chain method of tearing open of load Network Based, network side are measured reverse link load and forward link load, and described reverse link load and forward link load are sent to terminal; When described terminal in thresholding does not sometime have uplink data and sends and do not receive down link data and described reverse link load and forward link load all greater than threshold value, then described terminal initiates to tear open the chain request to the base station, removes the link of eating dishes without rice or wine and enters resting state.
According to one embodiment of present invention, not having uplink data when described terminal in thresholding sometime sends, and do not receive down link data and described reverse link load and forward link load when all being not more than the threshold value of setting, then described terminal does not send the chain request of tearing open; When the time of described terminal free of data transmitting-receiving surpassed the time threshold of setting, terminal initiated to tear open the chain request, and described terminal is removed the link of eating dishes without rice or wine, and enters dormant state.
According to one embodiment of present invention, described network side is measured the reverse link load and forward link load comprises: the base station is measured reverse link load and forward link load, and the result of described measurement is sent to BSC (Base Station Controller: base station controller); Wherein, for the EV-DO system, the base station is measured the contained fan forward link load and is adopted the method for measuring the Time Slot Occupancy rate, and described Time Slot Occupancy rate is in measurement period, the Time Slot Occupancy duration of Traffic Channel is divided by measuring duration, and perhaps other characterize the method for forward direction load; The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use the equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users, perhaps other characterize the method for reverse load; For CDMA 1X network: the base station is measured the contained fan forward link load and adopted: described base station measurement is at the ratio of corresponding contained fan forward direction actual emission power and rated power, and perhaps other characterize the method that forward directions are loaded; The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use the equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users, perhaps other characterize the method for reverse load.
According to one embodiment of present invention, describedly described reverse link load and forward link load are sent to terminal comprise: the forward link load that BSC reports described base station and reverse link are loaded and are sent to described terminal; Wherein, for the EV-DO system, described BSC uses Reverse Activity bit RAB that described reverse link load is sent to described terminal; Described BSC takes time-multiplexed mode that described forward link load is sent to described terminal by the RAB channel; For CDMA 1X network: described BSC uses FWI message such as (Flash With Information message) that described reverse link load and forward link load are sent to described terminal.
According to one embodiment of present invention, described terminal is compared with the forward direction speed of application according to the speed of the reception data of the contained fan of reality, if ratio is then judged the forward link load height greater than forward direction load door limit value; If described ratio judges then that less than described forward direction load door limit value forward link load is low.
Method of the present invention is according to judging that forward direction and back surpass threshold value to load, and terminal initiatively initiates to tear open the chain request, reduces the code word of eating dishes without rice or wine and takies, and increases the service-user number in the certain time length scope, reduces the space interface signaling load.
The technical problem that the present invention will solve provides a kind of terminal, can initiatively initiate to tear open the chain request under the situation of offered load height and supreme, downlink data.
A kind of terminal comprises: the load data receiving element is used for receiving reverse link load and the forward link load data that network side sends; Tear chain element open, when being used in thresholding sometime described terminal and not having uplink data and send and do not receive down link data and described reverse link load and forward link load all greater than threshold value, initiate to tear open the chain request to the base station, remove the link of eating dishes without rice or wine.
Embodiment according to a terminal of the present invention, not having uplink data when described terminal in thresholding sometime sends, and do not receive down link data and described reverse link load and forward link load when all being not more than the threshold value of setting, then the described chain element of tearing open does not send the chain request of tearing open, when the time of described terminal free of data transmitting-receiving surpasses the time threshold of setting, terminal initiates to tear open the chain request to the described chain element of tearing open, the described chain element of tearing open is removed the link of eating dishes without rice or wine, and described terminal enters dormant state.
According to the embodiment of a terminal of the present invention, the base station is measured reverse link load and forward link load, and the result that will measure sends to BSC; Wherein, for the EV-DO system, the base station is measured the contained fan forward link load and is adopted the method for measuring the Time Slot Occupancy rate, and described Time Slot Occupancy rate is in measurement period, the Time Slot Occupancy duration of the Traffic Channel of contained fan is divided by measuring duration, and perhaps other forward direction loads define and method of measurement; The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use the equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users, perhaps other reverse load definition and method of measurement; For CDMA 1X network: the base station is measured the forward link load of contained fan and adopted: the ratio of described base station measurement forward direction actual emission power and rated power or other forward directions load define and method of measurement; The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use the equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users, perhaps other reverse load definition and method of measurement.
According to the embodiment of a terminal of the present invention, BSC sends to described load data receiving element with forward link load and the reverse link load that described base station reports; Wherein, for the EV-DO system, described BSC uses Reverse Activity bit RAB that described reverse link load is sent to described load data receiving element; Described BSC takes time-multiplexed mode that described forward link load is sent to described load data receiving element by the RAB channel; For CDMA 1X network: described BSC uses FWI message such as (Flash With Information message) that described reverse link load and forward link load are sent to described load data receiving element.
According to the embodiment of a terminal of the present invention, described terminal is compared with the forward direction speed of application according to the speed of the reception data of reality, if ratio is then judged the forward link load height greater than forward direction load door limit value; If described ratio judges then that less than described forward direction load door limit value forward link load is low.
Terminal of the present invention initiatively initiates to tear open the chain request according to judging that forward direction and back surpass threshold value to load, reduces the code word of eating dishes without rice or wine and takies, and increases the service-user number in the certain time length scope, reduces the space interface signaling load.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to do one to the accompanying drawing of required use in embodiment or the description of the Prior Art below introduces simply, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is for tearing the flow chart of an embodiment of chain method open according to the terminal of load Network Based of the present invention;
Fig. 2 is for tearing the flow chart of another embodiment of chain method open according to the terminal of load Network Based of the present invention;
Fig. 3 is the schematic diagram according to an embodiment of terminal of the present invention.
Embodiment
With reference to the accompanying drawings the present invention is described more fully, exemplary embodiment of the present invention wherein is described.Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that obtains under the creative work prerequisite.Below in conjunction with each figure and embodiment technical scheme of the present invention is carried out many-sided description.
Fig. 1 is for tearing the flow chart of an embodiment of chain method open according to the terminal of load Network Based of the present invention.As shown in Figure 1:
Step 102, network side are measured reverse link load and forward link load, and the value of reverse link load and forward link load is sent to terminal.
Step 103, when terminal in thresholding does not sometime have uplink data and sends and do not receive down link data and reverse link load and forward link load all greater than threshold value, then terminal initiates to tear open the chain request to the base station, removes the link of eating dishes without rice or wine and enters resting state.
According to one embodiment of present invention, not having uplink data when terminal in thresholding sometime sends, and do not receive down link data and reverse link load and forward link load when all being not more than the threshold value of setting, then terminal does not send the chain request of tearing open.When the time of terminal free of data transmitting-receiving surpassed the time threshold of setting, terminal initiated to tear open the chain request, and terminal is removed the link of eating dishes without rice or wine, and enters dormant state.
According to one embodiment of present invention, if reverse link load according to the equivalent user number, then is on the corresponding contained fan of a base station, if noise rise, refer to that the base station rises at the noise that the carrier wave of respective cell measures.Forward link load refers to the transmitting power of base station on corresponding contained fan and the ratio of this contained fan rated power in the 1X system, refers to slot efficiency or bandwidth usage on the corresponding contained fan in EV DO system.
According to one embodiment of present invention, the base station is measured reverse link load and forward link load, and the result that will measure sends to BSC.BSC can directly send to terminal with the numerical value of reverse link load and forward link load, and terminal judges whether that according to the reverse link threshold value and the forward link threshold value that are kept in the terminal reverse link load and forward link load are all greater than threshold value.Whether BSC can judge whether reverse link load and forward link load greater than threshold value, and the result that will judge sends to terminal, and terminal learns that according to the result who receives whether reverse link load and forward link load are greater than threshold value.Surpass the duration thresholding set in the time of 15 seconds when the time of terminal free of data transmitting-receiving, terminal initiates to tear open the chain request.
According to one embodiment of present invention, for the EV-DO system, the method of measuring the Time Slot Occupancy rate that adopts is measured to the contained fan forward link load in the base station, the Time Slot Occupancy rate is in measurement period, the Time Slot Occupancy duration of Traffic Channel perhaps adopts other definition of forward direction load and method of measurement divided by measuring duration.The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use equivalent user counting method, be the number of users of current equivalence and the ratio between the maximum equivalent number of users, perhaps adopt other reverse load definition and method of measurement.For CDMA 1X network: the base station is measured the contained fan forward link load and is adopted: the ratio of base station measurement forward direction actual emission power and rated power, perhaps adopt other forward directions loads to define and method of measurement.The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use equivalent user counting method, be the number of users of current equivalence and the ratio between the maximum equivalent number of users, perhaps adopt other reverse load definition and method of measurement.
According to one embodiment of present invention, BSC sends to terminal with forward link load and the reverse link load that the base station reports.For the EV-DO system, BSC uses Reverse Activity bit RAB that the reverse link load is sent to terminal.BSC takes time-multiplexed mode that forward link load is sent to terminal by Reverse Activity bit RAB channel.Use FWI (Flash With Information message) message that reverse link load and forward link load are sent to terminal for CDMA 1X network: BSC.
According to one embodiment of present invention, terminal also can be compared with the forward direction speed of application according to the speed of the reception data of reality, if ratio is then judged the forward link load height greater than forward direction load door limit value.If ratio less than forward direction load door limit value, judges that then forward link load is low.
Method of the present invention is according to judging that forward direction and back surpass threshold value to load, and terminal initiatively initiates to tear open the chain request, reduces the code word of eating dishes without rice or wine and takies, and increases the service-user number in the certain time length scope, reduces the space interface signaling load.
Fig. 2 is for tearing the flow chart of another embodiment of chain method open according to the terminal of load Network Based of the present invention.As shown in Figure 2:
Step 202, network side are measured reverse link load and forward link load, and the value of reverse link load and forward link load is sent to terminal.
Step 203 is judged that terminal does not have uplink data in thresholding sometime to send and do not receive down link data.If, then enter step 204, if not, then enter step 205, do not carry out any processing.
Step 204 judges that whether reverse link load and forward link load are all less than threshold value.If, then enter step 205, do not carry out any processing.If not, then enter step 206, start timer.Step 207 judges that whether reverse link load and forward link load are all greater than threshold value.If, then enter step 209, whether that judges timer surpasses duration thresholding 1.If not, enter step 208, whether that judges timer surpasses duration thresholding 2.
Step 208, whether that judges timer surpasses duration thresholding 2.If not, then the cycle criterion timer whether surpass duration thresholding 1.If, entering step 210, terminal is removed the link of eating dishes without rice or wine, and enters resting state.
Step 209, whether that judges timer surpasses duration thresholding 1.If not, then the cycle criterion timer whether surpass duration thresholding 1.If, entering step 210, terminal is removed the link of eating dishes without rice or wine, and enters resting state.Reverse load was all greater than the load thresholding before thresholding 1 was corresponding, namely meaned reverse load height before this moment, therefore will in time remove the link of eating dishes without rice or wine, thus duration thresholding 1 to lack, as 8 seconds.And thresholding 2 corresponding preceding reverse loads are only monolateral greater than the load thresholding, namely mean monolateral load height this moment, and can have higher slightly tolerance degree this moment, and namely duration thresholding 2 will be grown, and can be equal to, or greater than thresholding 1, as 12 seconds.
Fig. 3 is the schematic diagram according to an embodiment of terminal of the present invention.As shown in Figure 3:
Terminal 31 comprises: load data receiving element 311 and tear chain element 312 open.Load data receiving element 311 receives reverse link load and the forward link load data that network side sends.Tear chain element 312 terminal in thresholding sometime open when not having uplink data and sending and do not receive down link data and reverse link load and forward link load all greater than threshold value, initiate to tear open the chain request to the base station, remove the link of eating dishes without rice or wine.Do not have uplink data when terminal in thresholding sometime and send, and do not receive down link data and reverse link load and forward link load when all being not more than the threshold value of setting, then tear chain element 312 open and do not send the chain request of tearing open.
According to one embodiment of present invention, the base station is measured reverse link load and forward link load, and the result that will measure sends to BSC.Wherein, for the EV-DO system, the base station is measured the contained fan forward link load and is adopted the method for measuring the Time Slot Occupancy rate, and the Time Slot Occupancy rate is in measurement period, the Time Slot Occupancy duration of Traffic Channel perhaps adopts other definition of forward direction load and method of measurement divided by measuring duration.The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use equivalent user counting method, be the number of users of current equivalence and the ratio between the maximum equivalent number of users, perhaps adopt other reverse load definition and method of measurement.For CDMA 1X network: the base station is measured the contained fan forward link load and is adopted: the ratio of base station measurement forward direction actual emission power and rated power, perhaps adopt other forward directions loads to define and method of measurement.The noise rise method that adopts is measured to contained fan reverse link load in the base station, be the quantity that current noise was made an uproar and improved the end of with respect to, or use equivalent user counting method, be the number of users of current equivalence and the ratio between the maximum equivalent number of users, perhaps adopt other reverse load definition and method of measurement.BSC sends to terminal load data receiving element 311 with forward link load and the reverse link load that the base station reports.Wherein, for the EV-DO system, BSC uses Reverse Activity bit RAB channel that the reverse link load is sent to terminal load data receiving element 311.BSC takes time-multiplexed mode that forward link load is sent to terminal load data receiving element 311 by the RAB channel.Use FWI message that reverse link load and forward link load are sent to terminal load data receiving element 311 for CDMA 1X network: BSC.
According to one embodiment of present invention, terminal is compared with the forward direction speed of application according to the speed of the reception data of reality, if ratio is then judged the forward link load height greater than forward direction load door limit value.If ratio less than forward direction load door limit value, judges that then forward link load is low.
According to one embodiment of present invention, terminal can be portable terminal, intelligent terminal, notebook, PDA etc.
Terminal of the present invention initiatively initiates to tear open the chain request according to judging that forward direction and back surpass threshold value to load, reduces the code word of eating dishes without rice or wine and takies, and increases the service-user number in the certain time length scope, reduces the space interface signaling load.
May realize method and system of the present invention in many ways.For example, can realize method and system of the present invention by any combination of software, hardware, firmware or software, hardware, firmware.The said sequence that is used for the step of method only is in order to describe, and the step of method of the present invention is not limited to above specifically described order, unless otherwise specify.In addition, in certain embodiments, can be the program that is recorded in the recording medium with the invention process also, these programs comprise for the machine readable instructions that realizes the method according to this invention.Thereby the present invention also covers the recording medium that storage is used for the program of execution the method according to this invention.
Description of the invention provides for example with for the purpose of describing, and is not exhaustively or limit the invention to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Selecting and describing embodiment is for better explanation principle of the present invention and practical application, thereby and makes those of ordinary skill in the art can understand the various embodiment that have various modifications that the present invention's design is suitable for special-purpose.

Claims (10)

1. the terminal of a load Network Based is torn the chain method open, it is characterized in that:
Network side is measured reverse link load and forward link load, and described reverse link load and forward link load are sent to terminal;
When described terminal in thresholding does not sometime have uplink data and sends and do not receive down link data and described reverse link load and forward link load all greater than threshold value, then described terminal initiates to tear open the chain request to the base station, removes the link of eating dishes without rice or wine and enters resting state.
2. the method for claim 1 is characterized in that:
Do not have uplink data when described terminal in thresholding sometime and send, and do not receive down link data and described reverse link load and forward link load when all being not more than the threshold value of setting, then described terminal does not send the chain request of tearing open.
3. the method for claim 1 is characterized in that, described network side is measured the reverse link load and forward link load comprises:
The base station is measured reverse link load and forward link load, and the result of described measurement is sent to BSC;
Wherein, for the EV-DO system, the base station is measured the contained fan forward link load and is adopted the method for measuring the Time Slot Occupancy rate, and described Time Slot Occupancy rate is in measurement period, and the Time Slot Occupancy duration of Traffic Channel is divided by measuring duration; The noise rise method that adopts is measured to contained fan reverse link load in the base station, i.e. the current noise quantity of making an uproar and improving the end of with respect to, or use equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users;
For CDMA 1X network: the base station is measured forward link load and is adopted: the ratio of described base station measurement contained fan forward direction actual emission power and rated power; The noise rise method that adopts is measured to contained fan reverse link load in the base station, i.e. the current noise quantity of making an uproar and improving the end of with respect to, or use equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users.
4. the method for claim 1 is characterized in that, describedly described reverse link load and forward link load are sent to terminal comprises:
BSC sends to described terminal with forward link load and the reverse link load that described base station reports;
Wherein, for the EV-DO system, described BSC uses Reverse Activity bit RAB channel that described reverse link load is sent to described terminal; Described BSC takes time-multiplexed mode that described forward link load is sent to described terminal by the RAB channel;
For CDMA 1X network, described BSC uses FWI message that described reverse link load and forward link load are sent to described terminal.
5. method as claimed in claim 3 is characterized in that:
Described terminal is compared with the forward direction speed of application according to the speed of the reception data of reality, if ratio is then judged the forward link load height greater than forward direction load door limit value; If described ratio judges then that less than described forward direction load door limit value forward link load is low.
6. terminal is characterized in that:
The load data receiving element is used for receiving reverse link load and the forward link load data that network side sends;
Tear chain element open, when being used in thresholding sometime described terminal and not having uplink data and send and do not receive down link data and described reverse link load and forward link load all greater than threshold value, initiate to tear open the chain request to the base station, remove the link of eating dishes without rice or wine.
7. terminal as claimed in claim 6 is characterized in that:
Do not have uplink data when described terminal in thresholding sometime and send, and do not receive down link data and described reverse link load and forward link load when all being not more than the threshold value of setting, then the described chain element of tearing open does not send the chain request of tearing open.
8. terminal as claimed in claim 7 is characterized in that:
The base station is measured reverse link load and forward link load, and the result that will measure sends to BSC;
Wherein, for the EV-DO system, the base station is measured the contained fan forward link load and is adopted the method for measuring the Time Slot Occupancy rate, and described Time Slot Occupancy rate is in measurement period, and the Time Slot Occupancy duration of Traffic Channel is divided by measuring duration; The noise rise method that adopts is measured to contained fan reverse link load in the base station, i.e. the current noise quantity of making an uproar and improving the end of with respect to, or use equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users;
For CDMA 1X network, the base station is measured the contained fan forward link load and is adopted: the ratio of described base station measurement forward direction actual emission power and rated power; The noise rise method that adopts is measured to contained fan reverse link load in the base station, i.e. the current noise quantity of making an uproar and improving the end of with respect to, or use equivalent user counting method, i.e. ratio between the number of users of current equivalence and the maximum equivalent number of users.
9. terminal as claimed in claim 7 is characterized in that:
BSC sends to described load data receiving element with forward link load and the reverse link load that described base station reports;
Wherein, for the EV-DO system, described BSC uses Reverse Activity bit RAB channel that described reverse link load is sent to described terminal; Described BSC takes time-multiplexed mode that described forward link load is sent to described load data receiving element by the RAB channel;
For CDMA 1X network, described BSC uses FWI message that described reverse link load and forward link load are sent to described load data receiving element.
10. terminal as claimed in claim 8 is characterized in that:
Described terminal is compared with the forward direction speed of application according to the speed of the reception data of reality, if ratio is then judged the forward link load height greater than forward direction load door limit value; If described ratio judges then that less than described forward direction load door limit value forward link load is low.
CN2011104455093A 2011-12-28 2011-12-28 Terminal link disconnection method based on network load and terminal Pending CN103188720A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104455093A CN103188720A (en) 2011-12-28 2011-12-28 Terminal link disconnection method based on network load and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104455093A CN103188720A (en) 2011-12-28 2011-12-28 Terminal link disconnection method based on network load and terminal

Publications (1)

Publication Number Publication Date
CN103188720A true CN103188720A (en) 2013-07-03

Family

ID=48679607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104455093A Pending CN103188720A (en) 2011-12-28 2011-12-28 Terminal link disconnection method based on network load and terminal

Country Status (1)

Country Link
CN (1) CN103188720A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060083161A1 (en) * 2003-02-24 2006-04-20 Rajiv Laroia Methods and apparatus for determining, communicating and using information which can be used for interference control purposes
CN1787682A (en) * 2004-12-07 2006-06-14 华为技术有限公司 Method for controlling up-link load of base station
CN101702814A (en) * 2009-11-25 2010-05-05 中国人民解放军信息工程大学 Reverse link rate control method, system, base station and terminal
CN101895998A (en) * 2009-05-21 2010-11-24 中国电信股份有限公司 Management method and system of grouped data transmission state

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060083161A1 (en) * 2003-02-24 2006-04-20 Rajiv Laroia Methods and apparatus for determining, communicating and using information which can be used for interference control purposes
CN1787682A (en) * 2004-12-07 2006-06-14 华为技术有限公司 Method for controlling up-link load of base station
CN101895998A (en) * 2009-05-21 2010-11-24 中国电信股份有限公司 Management method and system of grouped data transmission state
CN101702814A (en) * 2009-11-25 2010-05-05 中国人民解放军信息工程大学 Reverse link rate control method, system, base station and terminal

Similar Documents

Publication Publication Date Title
CN102695202B (en) The method of reshuffling, radio network controller and terminal
CN102724715B (en) The control method of a kind of auxiliary carrier wave, control equipment and mobile communication system
EP3131238A1 (en) System for providing intelligent network access selection for a mobile wireless device
EP2747493A1 (en) Power control method, base station and terminal equipment
WO2012139377A1 (en) Method, system, terminal, and base station for uplink scheduling
CN104105199A (en) Paging method, device and system
CN104202755A (en) Channel detection method, terminal and system
CN102624500A (en) CQI reporting method, and method, system, terminal and base station for acquiring CQI
CN103580794A (en) Channel state information reporting method, base station and UE
CN101977405A (en) Delayed-release method and device for temporary block flow
CN102970711A (en) Data transmission method and device based on multiple system networks
WO2016145876A1 (en) Component carrier link management method and device
CN102378122B (en) The system of selection of self adaptation multicast transmission mechanism
CN103053197A (en) Control device, communication terminal device, and wireless communication system
CN102131238A (en) Load balancing method from time division-synchronization code division multiple access (TD-SCDMA) system to global system for mobile communication (GSM) system
CN104349465B (en) The establishing method and device of wireless network doze output
CN102595646A (en) Vent resource processing method and equipment
CN105144834B (en) Wireless LAN station access management product and method
CN103188720A (en) Terminal link disconnection method based on network load and terminal
CN101019461B (en) Method and system for wireless network connection
CN101945405B (en) UE paging method and system for mobile communication
CN103260225B (en) Discontinuous reception (DRX) control method and device
CN101765193B (en) Method for scheduling resource in EDCH, user terminal and communication system
CN103974378A (en) Low-bitrate user access control method based on QoS guarantee and contention window
CN107005938A (en) A kind of method and device of reception group business datum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130703